Tender Details
Particulars | Details |
---|---|
Title |
Etaining Wall And Footpath With Hand Railing Starting From Bala Krishna Bahadur House To Khil Bahadur House At Nepali Basthi In Ward No12
|
Description |
Construction Of Rcc Retaining Wall And Footpath With Hand Railing Starting From Bala Krishna Bahadur House To Khil Bahadur House At Nepali Basthi In Ward No12
|
Organisation | Port Blair Municipal Council | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 9283 |
Tender Value | |
Place | Nepali Basthi in Ward No 12 |
Link |
AAAAAAAAAA Login to view |
Start Date | May 13, 2025 22:30 |
End Date |
20/05/2025 ( 1 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreZone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Read moreConstruction of cc road at 09 places and drain construction work from a.m. mishra to ashok sahu in ballabh nagar ward, sagar- parshad nidhi
Construction of cc road at 09 places and drain construction work from a.m. mishra to ashok sahu in ballabh nagar ward, sagar- parshad nidhi
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConst. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham
Const. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham
Read moreCement concrete work on road from house no. 29/b/s-2 dilip jaisawal house to chhtrasal school main road to radha krishna mandir house no. 48/d/s-2 at scheme no. 78 in ward no. 32 under zone no. 07
Cement concrete work on road from house no. 29/b/s-2 dilip jaisawal house to chhtrasal school main road to radha krishna mandir house no. 48/d/s-2 at scheme no. 78 in ward no. 32 under zone no. 07
Read moreIn ward 14 sarai maluk chand saraswati vihar, drain and c.c. road construction work from pappu kushwah to beena kushwah, gopal sharma to krishna, nanhe kha to kalyan singh.
In ward 14 sarai maluk chand saraswati vihar, drain and c.c. road construction work from pappu kushwah to beena kushwah, gopal sharma to krishna, nanhe kha to kalyan singh.
Read moreIn ward 79 karban gali, from ghasi ka bada to ruby via toilet, from krishna to prem, from shri ram to golden staircase temple, from pawan house to shivhare via golden staircase temple, from anupam to kulkul, from mohan to totaram, from mohan to vij
In ward 79 karban gali, from ghasi ka bada to ruby via toilet, from krishna to prem, from shri ram to golden staircase temple, from pawan house to shivhare via golden staircase temple, from anupam to kulkul, from mohan to totaram, from mohan to vij
Read moreof your Industry type