Tender Details

Particulars Details
Title
Etaining Wall And Footpath With Hand Railing Starting From Bala Krishna Bahadur House To Khil Bahadur House At Nepali Basthi In Ward No12
Description
Construction Of Rcc Retaining Wall And Footpath With Hand Railing Starting From Bala Krishna Bahadur House To Khil Bahadur House At Nepali Basthi In Ward No12
Organisation Port Blair Municipal Council | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 9283
Tender Value
Place Nepali Basthi in Ward No 12
Link

AAAAAAAAAA

Login to view
Start Date May 13, 2025 22:30
End Date

20/05/2025 ( 1 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency

Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency

Read more
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.

Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.

Read more
Construction of cc road at 09 places and drain construction work from a.m. mishra to ashok sahu in ballabh nagar ward, sagar- parshad nidhi

Construction of cc road at 09 places and drain construction work from a.m. mishra to ashok sahu in ballabh nagar ward, sagar- parshad nidhi

Read more
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Read more
Const. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham

Const. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham

Read more
Cement concrete work on road from house no. 29/b/s-2 dilip jaisawal house to chhtrasal school main road to radha krishna mandir house no. 48/d/s-2 at scheme no. 78 in ward no. 32 under zone no. 07

Cement concrete work on road from house no. 29/b/s-2 dilip jaisawal house to chhtrasal school main road to radha krishna mandir house no. 48/d/s-2 at scheme no. 78 in ward no. 32 under zone no. 07

Read more
In ward 14 sarai maluk chand saraswati vihar, drain and c.c. road construction work from pappu kushwah to beena kushwah, gopal sharma to krishna, nanhe kha to kalyan singh.

In ward 14 sarai maluk chand saraswati vihar, drain and c.c. road construction work from pappu kushwah to beena kushwah, gopal sharma to krishna, nanhe kha to kalyan singh.

Read more
In ward 79 karban gali, from ghasi ka bada to ruby via toilet, from krishna to prem, from shri ram to golden staircase temple, from pawan house to shivhare via golden staircase temple, from anupam to kulkul, from mohan to totaram, from mohan to vij

In ward 79 karban gali, from ghasi ka bada to ruby via toilet, from krishna to prem, from shri ram to golden staircase temple, from pawan house to shivhare via golden staircase temple, from anupam to kulkul, from mohan to totaram, from mohan to vij

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise