Tender Details

Particulars Details
Title
Di Of 6.6 Kv O/H Line Due To Widening And Making Of New Haul Road For Ob Dumping And Coal Dump And Di Of 440 V O/H Line Due To Coal Dump In Socp Of Muraidih, Amp Colliery
Description
Di Of 6.6 Kv O/H Line Due To Widening And Making Of New Haul Road For Ob Dumping And Coal Dump And &#X0d Di Of 440 V O/H Line Due To Coal Dump In Socp Of Muraidih, Amp Colliery
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2024_BCCL_313122_1
Reference
Number
BCCL/GM/AR-I/AM (ENM)/E-TENDER/2024-25/167
Tender Fee 0
EMD 1400
Tender Value -
Place AMP COLLIERY BARORA AREA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=324480

Start Date July 23, 2024 00:00
End Date
Expired 02/08/2024

Expired 802 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Di of 6.6 kv o/h line due to widening of haul road ob dumping in old coal face socp under muraidih, amp colliery

Di of 6.6 kv o/h line due to widening of haul road ob dumping in old coal face socp under muraidih, amp &#x0d colliery

Read more
Di of 440v o/h line due to advancement of coal dump in socp, muraidih, amp colliery.

Di of 440v o/h line due to advancement of &#x0d coal dump in socp, muraidih, amp colliery.

Read more
Di of 6.6kv o/h line for widening of haul road and ob dumping to feeding power of 4000gpm motor pump in socp muraidih under amp colliery

Di of 6.6kv o/h line for widening of haul road and ob dumping to feeding power of 4000gpm motor pump &#x0d in socp muraidih under amp colliery

Read more
Di of 6.6kv o/h line due to advancement of ob dump near view point and extension of 6.6kv o/h line to feeding power to marion shovel in ob face socp under muraidih colliery

Di of 6.6kv o/h line due to advancement of ob dump near view point and extension of 6.6kv o/h line to &#x0d feeding power to marion shovel in ob face socp under muraidih colliery

Read more
Di of 6.6kv o/h line near silo side due to ob dumping and ob face advancement and tensioning of sagged conductor feeding power to 4000gpm pump of socp under muraidih, amp colliery.

Di of 6.6kv o/h line near silo side due to ob dumping and ob face advancement and tensioning of sagged &#x0d conductor feeding power to 4000gpm pump of socp under muraidih, amp colliery.

Read more
Diversion of 6.6kv o/h line due to advancement of ob face in socp patch at muraidih, amp colliery.

Diversion of 6.6kv o/h line due to advancement of ob face in socp patch at muraidih, amp colliery.

Read more
For the shifting of 6.6kv/550v/440v,1.5mva jogta substn. with di of 6.6kv,550v/440v o/h lines extension ob dump knc

For the shifting of 6.6kv/550v/440v,1.5mva,jogta substation near 3 pit,jogta with di of 6.6kv ,550v/440v o/h lines for the extension of ob dump under kankanee colliery under sijua area

Read more
Di of 3.3kv overhead line to feeding power of chitahi basti due to o.b. dumping to socp muraidih, amp colliery.

Di of 3.3kv overhead line to feeding power of &#x0d chitahi basti due to o.b. dumping to socp muraidih, amp &#x0d colliery.&#x0d

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise