Tender Details
Particulars | Details |
---|---|
Title |
Desilting And Opening Of Nallah To Maintain Smooth Flow During Heavy Monsoon In Carmona Village In Benaulim Constituency
|
Description |
Desilting And Opening Of Nallah To Maintain Smooth Flow During Heavy Monsoon In Carmona Village In Benaulim Constituency
|
Organisation | WATER RESOURCE DEPARTMENT | State Govt. and UT |
Tender Id | 2024_WRD_17486_1 |
Reference Number |
WDII/TECH/F17/13e/2024-25/SN6 |
Tender Fee | 3000 |
EMD | 9490 |
Tender Value | |
Place | Rawanfond |
Link | https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=17834 |
Start Date | September 26, 2024 21:30 |
End Date |
08/10/2024 ( Expired 223 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreE-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreIndependent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Independent engineer services during operation and maintenance of the stretch tolling operation maintenance and transfer of orai-bara section from km 1515.713 to km 1578.872 of nh-25 in the state of uttar pradesh
Read moreModification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Modification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Read moreWbpwd/pw(r)/se/shc/nit no 05 of 2025-2026(sl-02)
Permanent protection work of breached portions during flood 2024 from km 3.540 to km 3.600 and km 3.615 to km 3.950 of singti-pancharul road under howrah highway division in the district of howrah.
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreRehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Rehabilitation of damaged cement concrete pavement, bridge repair and all other works which are not performed during maintenance period in km. 11.600 to 16.00 km. 34.00 to 39.00 and km. 57.00 to 62.00 nashik to state border nashik peth kaparada nh
Read moreIe services during operation and maintenance of the stretch tolling operation maintenance and transfer of chichra kharagpur section of nh49 from existing km 185.150 (design km 16.130) to km 129.000 (design km 72.250) in west bengal
Ie services during operation and maintenance of the stretch tolling operation maintenance and transfer of chichra kharagpur section of nh49 from existing km 185.150 (design km 16.130) to km 129.000 (design km 72.250) in west bengal
Read moreAm to roads&drains- desilting,earthwork,painting and sectioning in north zone of nts during 2024-25
Am to roads&drains- desilting,earthwork,painting and sectioning in north zone of nts during 2024-25
Read moreOil bound distempering painting of 100 no houses t1 to t6 exterior paint of 64 no. houses t5 sector 3 and addition of toilet adjoining to house no 2 t8 in existing area of bbmb colony talwara township during the year 2025 26
Oil bound distempering painting of 100 no houses t1 to t6 exterior paint of 64 no. houses t5 sector 3 and addition of toilet adjoining to house no 2 t8 in existing area of bbmb colony talwara township during the year 2025 26
Read moreof your Industry type