Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Rate Contract For Cutting And Clearance Of Wild Growth In Factory And Township Areas
|
| Description |
Annual Rate Contract For Cutting And Clearance Of Wild Growth In Factory And Township Areas
|
| Organisation | Department of Fertilisers | Central Govt. Ministry/Department |
| Tender Id | 2024_MCF_743972_1 |
|
Reference Number |
NFB/CIVIL/CW -318 |
| Tender Fee | 500 |
| EMD | 25000 |
| Tender Value | |
| Place | NFL BATHINDA |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1047074 |
| Start Date | February 02, 2024 14:30 |
| End Date |
Expired
04/03/2024
Expired 873 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreAnnual rate contract for cutting and clearance of wild growth in factory and township areas
Annual rate contract for cutting and clearance of wild growth in factory and township areas
Read moreArc for wild growth clearance in township and factory area during the year 2024-25
Arc for wild growth clearance in township and factory area during the year 2024-25
Read moreArc for wild growth clearance in township and factory area during the year 2025- 26
Arc for wild growth clearance in township and factory area during the year 2025- 26
Read moreAnnual rate contract for horticulture maintenance in factory and township areas
Annual rate contract for horticulture maintenance in factory and township areas
Read moreAnnual rate contract for horticulture maintenance in factory and township areas
Annual rate contract for horticulture maintenance in factory and township areas
Read moreAnnual rate contract for horticulture maintenance in factory and township
Annual rate contract for horticulture maintenance in factory and township
Read moreof your Industry type