Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Constt. Of Tile Lane From Ho Gh Hussain Malik To Ho Gh Rasool Malik And Gh Hussain Malik At Waterwani.
|
| Description |
Constt. Of Tile Lane From Ho Gh Hussain Malik To Ho Gh Rasool Malik And Gh Hussain Malik At Waterwani.
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_RDPR_232256_15 |
|
Reference Number |
NIT_163 REW BUDGAM OF 2023-24 |
| Tender Fee | 200 |
| EMD | 2600 |
| Tender Value | |
| Place | Executive Engineer REW Budgam |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | October 06, 2023 20:30 |
| End Date |
Expired
11/10/2023
Expired 1013 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreTiruppur city municipal corporation_outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Outsourcing of man power for one year to water supply distribution work at ward no 28,29,40,54,55 and 57 in tiruppur city municipal corporation, zone 4 may 2026 to april 2027 one year
Read moreUpgradation of existing 80 bedded golden jubilee hospital to a 300 bedded multi-disciplinary super specialty hospital at visakhapatnam port on design, built, finance, operate and transfer (dbfot) basis.
Upgradation of existing 80 bedded golden jubilee hospital to a 300 bedded multi-disciplinary super specialty hospital at visakhapatnam port on design, built, finance, operate and transfer (dbfot) basis.
Read moreConstt. of tile lane from h/o gh hussain malik to h/o gh rasool malik and gh hussain malik at waterwani.
Constt. of tile lane from h/o gh hussain malik to h/o gh rasool malik and gh hussain malik at waterwani.
Read moreConstt. of tile lane from h/o gh hussain malik to h/o gh rasool malik and gh hussain malik at waterwani.
Constt. of tile lane from h/o gh hussain malik to h/o gh rasool malik and gh hussain malik at waterwani.
Read moreConstruction of tile lane from ho imtiyaz malik to gh qadir hajam
Construction of tile lane from ho imtiyaz malik to gh qadir hajam
Read moreof your Industry type