Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Regarding Excavation Of Forest Ponds And Continuous Contour Trenches In The Shirkhed Round
|
| Description |
Please Refer Tender Documents
|
| Organisation | Head Of Forest Force Nagpur Maharashtra State | State Govt. and UT |
| Tender Id | 2026_HFFN_1282622_1 |
|
Reference Number |
Regarding excavation of forest ponds and continuous contour trenches in the Shirkhed circle |
| Tender Fee | 1180 |
| EMD | 20200 |
| Tender Value | - |
| Place | Deputy Conservator Of Forest Amravati |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2205982 |
| Start Date | March 05, 2026 17:30 |
| End Date |
Expired
12/03/2026
Expired 216 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Excavation of pits/ trenches for water supply pipeline repair and maintenance works
Excavation of pits/ trenches for water supply pipeline repair and maintenance works
Read moreHandling and transport on lumpsum basis - excavation
Handling and transport on lumpsum basis - excavation
Read moreEarth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha
Earth work for excavation of trenches for laying of underground pipeline, lowering and jointing of rcc pipe frommogha
Read moreExcavation of elephant proof trench 1.360km. at chennagoundar land to madamma land of p g palya wildlife range during 2026-27
Excavation of elephant proof trench 1.360km. at chennagoundar land to madamma land of p g palya wildlife range during 2026-27
Read moreEarthworks at allocated advance soil work sites, such as pit digging, trenching, and stretch talaai trench-cum-bunding contour trenching in lalsot. dausa
Earthworks at allocated advance soil work sites, such as pit digging, trenching, and stretch talaai trench-cum-bunding contour trenching in lalsot. dausa
Read moreStraight knife cutting machine,round knife cutting machine,band knife machine,die cutting machine,continuous fusing machine,ironing table vacuum blowing
Straight knife cutting machine,round knife cutting machine,band knife machine,die cutting machine,continuous fusing machine,ironing table vacuum blowing
Read moreEarthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda
Earthwork for excavation of trenches for laying of hdpe ugps construction of pump room construction of sump well pumping system and electric work in pump room complete at stp kot shamir tehsil and district bathinda
Read moreCustom bid for services - beating up of causalities buc in comptt no 42a by kunt ie plantation of 250 nos of pb plants in pits 300 nos of grass slips in patches and 050 ha of bush clearance under campa ca,custom bid for services - beating up of causalities buc in comptt no 66 by kunt ie plantation of 625 nos of pb plants in pits 600 nos of grass slips in patches and 10 ha of bush clearance under campa ca,custom bid for services - beating up of causalities buc in comptt no58 by kuntie plantation of 500 nos of pb plants in pits 600 nos of grass slips in patches and 1 ha of bush clearance under campa ca,custom bid for services - beating up of causalities buc in comptt no 52 by kuntze plantation of 403 nos of pr plants in pits 600 nos of grass slips in patches and 1 ha of rush clearance under campa ca,custom bid for services - bearing up of causalities buc in compti no 73 by sie plantation of 625 nos of pb plants in pits plantation of 250 nos of pb plants in trenches 600 nos of grass slips in patches and 1 h
Custom bid for services - beating up of causalities buc in comptt no 42a by kunt ie plantation of 250 nos of pb plants in pits 300 nos of grass slips in patches and 050 ha of bush clearance under campa ca,custom bid for services - beating up of causalities buc in comptt no 66 by kunt ie plantation of 625 nos of pb plants in pits 600 nos of grass slips in patches and 10 ha of bush clearance under campa ca,custom bid for services - beating up of causalities buc in comptt no58 by kuntie plantation of 500 nos of pb plants in pits 600 nos of grass slips in patches and 1 ha of bush clearance under campa ca,custom bid for services - beating up of causalities buc in comptt no 52 by kuntze plantation of 403 nos of pr plants in pits 600 nos of grass slips in patches and 1 ha of rush clearance under campa ca,custom bid for services - bearing up of causalities buc in compti no 73 by sie plantation of 625 nos of pb plants in pits plantation of 250 nos of pb plants in trenches 600 nos of grass slips in patches and 1 h
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreof your Industry type