Tender Details

About Tender

๐Ÿ—๏ธ Construction Opportunity: B/Wall Gena... ๐Ÿ–๏ธ The Haryana Government Has Issued A Tender For The Construction Of A General Shamshan Ghat At Village Rolad Latifpur, Block Sonipat, Hgvy. ๐Ÿ•Œ ๐Ÿ“… Bid Submission Deadline: June 18, 2024, 9:00 Am Interested Contractors Are Required To Submit A Tender Fee Of Inr 2180 Along With An Earnest Money Deposit (Emd) Of Inr 9150. ๐Ÿ’ฐ Detailed Project Specifications And Requirements Are Available In The Tender Document. Proposals Should Demonstrate Expertise In Civil Construction, Adherence To Safety Standards, And Compliance With Environmental Regulations. Keywords: Construction, Shamshan Ghat, Haryana Government, Hgvy, Civil Works, Tender, Emd, B/Wall Gena...
Particulars Details
Title
Construction Of B/Wall Gena...
Description
Construction Of Genaral Shamshan Ghat At Village Rolad Latifpur Block Sonipat Hgvy
Organisation Haryana Government | State Govt. and UT
Tender Id 2024_HRY_372713_1
Reference
Number
20242AA717D0 B8E2 4C01 B9EC 574E8D95585A1998DEV
Tender Fee 2180
EMD 9150
Tender Value
Place ROLAD LATIFPUR
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=448621

Start Date June 07, 2024 22:30
End Date
Expired 01/07/2024

Expired 751 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Construction of drainage at mgr nagar in narasingarayanpettai

Construction of drainage at mgr nagar in narasingarayanpettai

Read more
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Read more
Development of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works

Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works

Read more
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2

Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&amp#x0d

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Read more
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise