Tender Details

Particulars Details
Title
Repair Restoration Of Rain Damages On Link Road To Village Sanoh Km 000 To 200 Sh Const Of U Shape Drain At Rd 1879 To 2000 Dc Deposit
Description
Repair Restoration Of Rain Damages On Link Road To Village Sanoh Km 000 To 200 Sh Const Of U Shape Drain At Rd 1879 To 2000 Dc Deposit
Organisation PWD | State Govt. and UT
Tender Id 2025_PWD_105387_1
Reference
Number
LR Village Sanoh Under Bharwain Job-3
Tender Fee 350
EMD 4000
Tender Value
Place Bharwain
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=154442
Start Date May 17, 2025 15:30
End Date

23/05/2025 ( Expired 16 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Annual surfacing on link road to village khatnol km. 0/00 to 10/000

Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Cs for ae for supervision of const. of 4 n 6 lane gf connectivity from talwara jattan vill on nh44 to gobindsar vill on delhi amritsar katra expressway km 0.000 to km 12.345 (pathankot link road) in punjab on epc mode under nh(o)2nd call

Cs for ae for supervision of const. of 4 n 6 lane gf connectivity from talwara jattan vill on nh44 to gobindsar vill on delhi amritsar katra expressway km 0.000 to km 12.345 (pathankot link road) in punjab on epc mode under nh(o)2nd call

Read more
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge

Read more
Consrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra

Consrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra

Read more
Construction of u shape rcc drain, boundary wall of parks and missing drain on road no 2 along with interlocking tiles at i.a. baghat distt. baghpat

Construction of u shape rcc drain, boundary wall of parks and missing drain on road no 2 along with interlocking tiles at i.a. baghat distt. baghpat

Read more
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode

Read more
Mending damages of potholes at different locations on link road (jhargram jamboni road to parihati-jamboni-fekoghat road) in between chainage 0.00 kmp to 3.50 kmp under jhargram division, pwd in the district of jhargram.

Mending damages of potholes at different locations on link road (jhargram jamboni road to parihati-jamboni-fekoghat road) in between chainage 0.00 kmp to 3.50 kmp under jhargram division, pwd in the district of jhargram.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise