Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Station Building, Orh, Platform, Pp Shelter, Subway, Approach Road, Development Of Circulating Area, Boundary Wall, Drain In Yard And Other Misc. Work At Areraj Station In Connection With Construction Of Hajipur Sagauli New Rail Line Project.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73768136 |
Reference Number |
ECR-CAO-C-N-ETN-73-23-24 |
Tender Fee | 0 |
EMD | 13.83 Lakh |
Tender Value | |
Place | Hazipur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73768136/viewNitPdf_4490191.pdf |
Start Date | February 24, 2024 00:16 |
End Date |
18/03/2024 ( Expired 473 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Constr of rail flyover b/w aligarh jction station and harduaganj station comprising earthwork in formation, p-way, minor bridges, ror, bndry wall, new manzoorgarhi stationyard devt in connection with constr of rfo-4 under ncr,ministry of railys,g.o.i
Constr of rail flyover b/w aligarh jction station and harduaganj station comprising earthwork in formation, p-way, minor bridges, ror, bndry wall, new manzoorgarhi stationyard devt in connection with constr of rfo-4 under ncr,ministry of railys,g.o.i
Read moreConstruction of health institution level-ii p.h.c. at tharolla tehsil kotkhai in distt shimla hp, construction of building portion, ws and si, site development, boundary wall, approaches and retaining structure)
Construction of health institution level-ii p.h.c. at tharolla tehsil kotkhai in distt shimla hp, construction of building portion, ws and si, site development, boundary wall, approaches and retaining structure)
Read moreConstruction of boundary wall on campus of new zila parishad building. and other works in different places district palamu
Construction of boundary wall on campus of new zila parishad building. and other works in different places district palamu
Read moreConstruction/ repairing of boundary wall, sewer line and rcc flowering in the campus state tax building 5-meerabai marg district-lucknow (u.p.)
Construction/ repairing of boundary wall, sewer line and rcc flowering in the campus state tax building 5-meerabai marg district-lucknow (u.p.)
Read moreConstruction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of boundary wall arround 16 mig flat including vacant land beside new office building in housing board colony, sarley, hazaribagh.
Construction of boundary wall arround 16 mig flat including vacant land beside new office building in housing board colony, sarley, hazaribagh.
Read moreConstruction of boundary wall (l - 250.00 mtr), steel gate, parking yard in/c a new septic tank at ganganagar phc.
Construction of boundary wall (l - 250.00 mtr), steel gate, parking yard in/c a new septic tank at ganganagar phc.
Read moreConstruction of boundary wall on campus zila parishad palamu
Construction of boundary wall on campus&#x0d of new zila parishad building. and other works in&#x0d different places district palamu
Read moreConstruction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at chandipur 33/11
Construction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at chandipur 33/11
Read moreof your Industry type