| Particulars | Details |
|---|---|
| Title |
Construction Of Recharging Pit With Vertical Filter To Be Constructed In The Submergence Of Reservoir/ Pond/Stop Dam And Recharging Pit Around The Less Yield Tube Well Nos Of Work Shaft And Recharging Pit District Sagar M.P.
|
| Description |
Construction Of Recharging Pit With Vertical Filter To Be Constructed In The Submergence Of Reservoir/ Pond/Stop Dam And Recharging Pit Around The Less Yield Tube Well Nos Of Work Shaft And Recharging Pit District Sagar M.P.
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_PHED_286550_1 |
|
Reference Number |
NIT No.28 EE/PHED/2023-24/Sagar Dt.22.06.2023 |
| Tender Fee | 12500 |
| EMD | 1.34 Lakh |
| Tender Value | - |
| Place | Executive Engineer PHE Division Sagar |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | June 24, 2023 17:00 |
| End Date |
Expired
10/07/2023
Expired 1193 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantl pcc,dismantl brick mason,dismantl rcc,excv less than 3 ord dis out,wet mix macadam,s and f coarse sand,pcc plin 1 is to 1.5 is to 3 cs,brk msn pl cs cl50,plaster 18mm cs 1 is to 5,neat cement punning,rcc design mix m25,sfe str stl manual,steel reinforcement,precast rcc,hume pipe np3 600mm,bld pnt cmt prim 2c,bld pnt exterior,bld pop putty,bib cock,urinal china 430x260,soap tray,towel ring,pvc exhaust fan 12 inch,ceiling fan 48 inch,soak pit,hdpe water tk 1000l,pcc plin 1 is to 3 is to 6 cs,hf brk ab pl cs c75,stone raise pointing,plaster 12mm cs 1 is to 5,plaster 6mm cs 1 is to 4,ceramic tiles 5mm,vitrified 600x600x10,upvc waste pip 100nb,hdpe pipe conceal 20,hdpe pipe conceal 25,hdpe water tk 500l,brass ball vlv 25nb,mirror 6mm polished,towel rail,wash basin 450x300mm,soap container,wc indian,urinal china 580x380,floor trap 100mm opn,stop cock 20nb,wood door nondeco 35,louver glass powder,septic tank 100 pers,ss 304 grade railing
Dismantl pcc,dismantl brick mason,dismantl rcc,excv less than 3 ord dis out,wet mix macadam,s and f coarse sand,pcc plin 1 is to 1.5 is to 3 cs,brk msn pl cs cl50,plaster 18mm cs 1 is to 5,neat cement punning,rcc design mix m25,sfe str stl manual,steel reinforcement,precast rcc,hume pipe np3 600mm,bld pnt cmt prim 2c,bld pnt exterior,bld pop putty,bib cock,urinal china 430x260,soap tray,towel ring,pvc exhaust fan 12 inch,ceiling fan 48 inch,soak pit,hdpe water tk 1000l,pcc plin 1 is to 3 is to 6 cs,hf brk ab pl cs c75,stone raise pointing,plaster 12mm cs 1 is to 5,plaster 6mm cs 1 is to 4,ceramic tiles 5mm,vitrified 600x600x10,upvc waste pip 100nb,hdpe pipe conceal 20,hdpe pipe conceal 25,hdpe water tk 500l,brass ball vlv 25nb,mirror 6mm polished,towel rail,wash basin 450x300mm,soap container,wc indian,urinal china 580x380,floor trap 100mm opn,stop cock 20nb,wood door nondeco 35,louver glass powder,septic tank 100 pers,ss 304 grade railing
Read moreGround water recharging through recharge pit around less yield tubewell etc. complete
Ground water recharging through recharge pit around less yield tubewell etc. complete
Read moreGround water recharging through recharge pit around less yield tubewell etc. complete
Ground water recharging through recharge pit around less yield tubewell etc. complete
Read moreGround water recharging through recharge pit around less yield tubewell etc. complete
Ground water recharging through recharge pit around less yield tubewell etc. complete
Read moreGround water recharging through recharge pit around less yield tubewell etc. complete
Ground water recharging through recharge pit around less yield tubewell etc. complete
Read moreGround water recharging through recharge pit around less yield tubewell etc. complete
Ground water recharging through recharge pit around less yield tubewell etc. complete
Read moreConstruction work for ground water recharging through recharge shaft with vertical filter to be constructed in the submergence of reservoir or pond or stop dam
Construction work for ground water recharging through recharge shaft with vertical filter to be constructed in the submergence of reservoir or pond or stop dam
Read moreConstruction work for ground water recharging through recharge shaft with vertical filter to be constructed in the submergence of reservoir or pond or stop dam
Construction work for ground water recharging through recharge shaft with vertical filter to be constructed in the submergence of reservoir or pond or stop dam
Read moreConstruction work for ground water recharging through recharge shaft with vertical filter to be constructed in the submergence of reservoir or pond or stop dam
Construction work for ground water recharging through recharge shaft with vertical filter to be constructed in the submergence of reservoir or pond or stop dam
Read moreConstruction work for ground water recharging through recharge shaft with vertical filter to be constructed in the submergence of reservoir or pond or stop dam
Construction work for ground water recharging through recharge shaft with vertical filter to be constructed in the submergence of reservoir or pond or stop dam
Read moreof your Industry type