Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Provision Signalling Arrangements In Connection With Ttr (Fstwscmsc) 156 Sets (1:12 154 Sets &Amp 1:16 2 Sets) In Tvc Division.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79156256 |
|
Reference Number |
TVC-SNT-SIG-24-25-25 |
| Tender Fee | 0 |
| EMD | 2.04 Lakh |
| Tender Value | - |
| Place | Chennai |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79156256/viewNitPdf_4813946.pdf |
| Start Date | December 26, 2024 17:26 |
| End Date |
Expired
17/01/2025
Expired 636 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Provision of signalling arrangements in connection with ttr works and casual renewal of bridge sleepers in tvc division
Provision of signalling arrangements in connection with ttr works and casual renewal of bridge sleepers in tvc division
Read moreExecution of signaling & telecommunication work in connection with: (1) raipur division - ttr (tws+wcmsc)-18 sets (main line) & 34 sets (loop line), ttr (wcmsc) -38 sets & ttr (ds)-8 sets, (2) bilaspur-durg: trr(p)-31.723 tkm.
Execution of signaling & telecommunication work in connection with: (1) raipur division - ttr (tws+wcmsc)-18 sets (main line) & 34 sets (loop line), ttr (wcmsc) -38 sets & ttr (ds)-8 sets, (2) bilaspur-durg: trr(p)-31.723 tkm.
Read moreSignalling work in connection with provision of ttr (fs+tws+wcmsc) -155 sets in passenger running loop lines in rewari-madar section of jaipur division.
Signalling work in connection with provision of ttr (fs+tws+wcmsc) -155 sets in passenger running loop lines in rewari-madar section of jaipur division.
Read moreSignalling works in connection with various ctr-ttr andother engineering works all over the lucknow division.
Signalling works in connection with various ctr-ttr andother engineering works all over the lucknow division.
Read more1) bortalao-kachewani-ttr (fs/tws/ecms) - 10 sets & ttr (ds)-01 sets. 2) durg-nagpur-through turnout sleeper renewal of point and crossings-105 sets. 3) durg-bortalao-ttr (fs+tws+wcmsc)-6 sets & ttr (ds)-2 sets. 4) turnout renewal - 11 sets (ds-04 sets, wcmsc -07 sets) in connection with the improvement and upgradation of running loop line under aden/gondia. 5) through turnout sleeper renewal at various yards in the jurisdiction of sr.den(east)/nagpur. 6) ttr-tws+wcmsc-40 sets &a
1) bortalao-kachewani-ttr (fs/tws/ecms) - 10 sets & ttr (ds)-01 sets. 2) durg-nagpur-through turnout sleeper renewal of point and crossings-105 sets. 3) durg-bortalao-ttr (fs+tws+wcmsc)-6 sets & ttr (ds)-2 sets. 4) turnout renewal - 11 sets (ds-04 sets, wcmsc -07 sets) in connection with the improvement and upgradation of running loop line under aden/gondia. 5) through turnout sleeper renewal at various yards in the jurisdiction of sr.den(east)/nagpur. 6) ttr-tws+wcmsc-40 sets &a
Read moreOhe work in connection with mansi - saharsa - ttr(tws+cmsc) - 20 sets (1:12) of samastipur division.
Ohe work in connection with mansi - saharsa - ttr(tws+cmsc) - 20 sets (1:12) of samastipur division.
Read moreSignalling work in c/w (i) ambala division -ttr(tws+cmsc) -40 sets, ttr(fs+tws+wcmsc)-13 sets, ttr(tws)- 65 sets, ttr(tsr)-110 sets & ttr( cmsc)-25 sets.(ii) yard improvement of klk yard under jurisdiction of aden/sml.(iii) rpj-dui (dn)-tsr(p) -13.625 tkm(iv) tsr(p) -48.363 km work over rpj-dui up line section.(v) saharnpur- ambala tsr(p) -14.583 tkm & ambala-rajpura- tsr (p) -1.000 tkm.(vi)yard improvement works in 35 yards under sr.den-2 umb ( doc, pta, dbn, nba, dnx, rphr, bxc, uk
Signalling work in c/w (i) ambala division -ttr(tws+cmsc) -40 sets, ttr(fs+tws+wcmsc)-13 sets, ttr(tws)- 65 sets, ttr(tsr)-110 sets & ttr( cmsc)-25 sets.(ii) yard improvement of klk yard under jurisdiction of aden/sml.(iii) rpj-dui (dn)-tsr(p) -13.625 tkm(iv) tsr(p) -48.363 km work over rpj-dui up line section.(v) saharnpur- ambala tsr(p) -14.583 tkm & ambala-rajpura- tsr (p) -1.000 tkm.(vi)yard improvement works in 35 yards under sr.den-2 umb ( doc, pta, dbn, nba, dnx, rphr, bxc, uk
Read moreRail bonding work in connection with track renewal in bly-bdc-skg-ttr 30 sets(60 kg 1 in 12) ttr (fs+tws+wcmsc)-40 sets (60 kg 1 in 12) and d/xing (dsd,ssd & td)- 18 sets (60 kg 1 in 8.5), ttr (fs+tws+wcmsc) -105 sets (60 kg 1 in 8.5 ), tftr-3.008 tkm in howrah division of eastern railway.
Rail bonding work in connection with track renewal in bly-bdc-skg-ttr 30 sets(60 kg 1 in 12) ttr (fs+tws+wcmsc)-40 sets (60 kg 1 in 12) and d/xing (dsd,ssd & td)- 18 sets (60 kg 1 in 8.5), ttr (fs+tws+wcmsc) -105 sets (60 kg 1 in 8.5 ), tftr-3.008 tkm in howrah division of eastern railway.
Read moreSignalling work in connection with provision of tws-290 sets in passenger running loop lines over rewari-madar section of jaipur division.
Signalling work in connection with provision of tws-290 sets in passenger running loop lines over rewari-madar section of jaipur division.
Read moreProvision of electronic interlocking system including outdoor signalling and telecommunication works in proposed yard arrangements at gadiganuru station in connection with additional loop line work.
Provision of electronic interlocking system including outdoor signalling and telecommunication works in proposed yard arrangements at gadiganuru station in connection with additional loop line work.
Read moreof your Industry type