Tender Details

Particulars Details
Title
Under District Ambedkarnagar, Construction Of Cc Road From Khulaspur Primary School To Shri Kamlesh Farm, Lot No 3
Description
Under District Ambedkarnagar, Construction Of Cc Road From Khulaspur Primary School To Shri Kamlesh Farm, Lot No 3&Amp#X0d
Organisation Director Cum Chief Engineer RED | State Govt. and UT
Tender Id 2025_REDUP_1016850_1
Reference
Number
1124/EE RED Ambedkarnagar/24-25 Dt 19/02/2025
Tender Fee 767
EMD 20000
Tender Value
Place AMBEDKARNAGAR
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1832830
Start Date March 12, 2025 16:30
End Date

29/03/2025 ( Expired 41 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Read more
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan

Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan

Read more
Construction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara

Construction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara

Read more
Upgradation of rural road from sh connection (krishna biswas home) to ramkrishnapur dam

Upgradation of rural road from sh connection (krishan biswas home) to ramkrishnapur dam at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no. an01hb21, length 4.425 km)

Read more
Upgradatrion of rural road from sh connection (near green island school) to rabindranagar ward no 6 at hut bay

Upgradation of rural road from sh connection (near green island school) to rabindranagar ward no 6 at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no an01hb22, length 2.700 km)&#x0d

Read more
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)

Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)

Read more
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh

Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise