Tender Details
Particulars | Details |
---|---|
Title |
Under District Ambedkarnagar, Construction Of Cc Road From Khulaspur Primary School To Shri Kamlesh Farm, Lot No 3
|
Description |
Under District Ambedkarnagar, Construction Of Cc Road From Khulaspur Primary School To Shri Kamlesh Farm, Lot No 3&Amp#X0d
|
Organisation | Director Cum Chief Engineer RED | State Govt. and UT |
Tender Id | 2025_REDUP_1016850_1 |
Reference Number |
1124/EE RED Ambedkarnagar/24-25 Dt 19/02/2025 |
Tender Fee | 767 |
EMD | 20000 |
Tender Value | |
Place | AMBEDKARNAGAR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1832830 |
Start Date | March 12, 2025 16:30 |
End Date |
29/03/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreConstruction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara
Construction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara
Read moreUpgradation of rural road from sh connection (krishna biswas home) to ramkrishnapur dam
Upgradation of rural road from sh connection (krishan biswas home) to ramkrishnapur dam at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no. an01hb21, length 4.425 km)
Read moreUpgradatrion of rural road from sh connection (near green island school) to rabindranagar ward no 6 at hut bay
Upgradation of rural road from sh connection (near green island school) to rabindranagar ward no 6 at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no an01hb22, length 2.700 km)
Read moreConstruction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)
Read moreConstruction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Construction of 2-lane rob at nh lc no. ab-72 on surajpur to ambikapur road in km 357.370 of nh-78 (new nh-43) at railway chainage 1925.11-12 on bishrampur to ambikapur railway line near jainagar in chhattisgarh
Read moreof your Industry type