Tender Details

Particulars Details
Title
Ttps Operation Circle Mpm I Units I And Ii Emptying Of Coal From Rc Bunkers 1 A To 1 F And 2 A To 2 F, Clearing Collecting, Loading, Transporting And Dumping The Coal At Coal Yard Ttps
Description
Ttps Operation Circle Mpm I Units I And Ii Emptying Of Coal From Rc Bunkers 1 A To 1 F And 2 A To 2 F, Clearing Collecting, Loading, Transporting And Dumping The Coal At Coal Yard Ttps
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_557133_1
Reference
Number
CE/SE/O/TTPS/Spec.No.103/25-26
Tender Fee 0
EMD 19400
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=665432
Start Date May 12, 2025 23:10
End Date

16/05/2025 ( Expired 43 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtps i mill plant unit iv clearing the mill rejects from unit-iii iv mill feeder area weighing in departmental weighbridge and transporting to rejects yard g switch yard area coal yard by using contractors vehicle and unloading the same and

Mtps i mill plant unit iv clearing the mill rejects from unit-iii iv mill feeder area weighing in departmental weighbridge and transporting to rejects yard g switch yard area coal yard by using contractors vehicle and unloading the same and

Read more
Ttps operation circle mpm ii unit iv and v reconditioning of the worn out journal head assembly released from unit iv and v hp 803 mills and assembling with pillow blocks

Ttps operation circle mpm ii unit iv and v reconditioning of the worn out journal head assembly released from unit iv and v hp 803 mills and assembling with pillow blocks

Read more
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash

Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from air preheaters to mills and insulating the ducts with lrb wool mattresses and cladding with g.i sheet of 0.63mm thickness and removal of ash

Read more
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul

Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul

Read more
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul.

Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul.

Read more
Ttps operation circle mpm i unit iii emptying of coal from rc bunkers 3a to 3f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps during the forthcoming overhaul

Ttps operation circle mpm i unit iii emptying of coal from rc bunkers 3a to 3f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps during the forthcoming overhaul

Read more
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul

Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul

Read more
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul

Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul

Read more
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site

Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site

Read more
Mtps i - civil circle clearing heavy jungles in between anthiyur feeder to salem 400kv-i and salem 400kv ii feeder on the rear side of switch yard of mtps i

Mtps i - civil circle clearing heavy jungles in between anthiyur feeder to salem 400kv-i and salem 400kv ii feeder on the rear side of switch yard of mtps i

Read more