Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
M And R For Fixing And Removing Of M S Needles To K.T. Weir Khanapur And Hilli
|
| Description |
M And R For Fixing And Removing Of M S Needles To K.T. Weir Khanapur And Hilli , Tal Akkalkot For The Year 2024 25
|
| Organisation | CE-Water Resources Dept. Pune | State Govt. and UT |
| Tender Id | 2024_CWRDP_1079981_4 |
|
Reference Number |
Tender Notice No.02 For 2024-25 KTW |
| Tender Fee | 2860 |
| EMD | 18500 |
| Tender Value | - |
| Place | Akkalkot |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1884574 |
| Start Date | September 03, 2024 22:40 |
| End Date |
Expired
18/09/2024
Expired 757 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Closing post monsoon 2026) and opening pre monsoon 2027 of k.t. weir needles of o.t.b at potrem, dessaiwada, bamonsai, otteabandh and owlleabandh in sanguem taluka.
Closing post monsoon 2026 and opening pre monsoon 2027 of k.t. weir needles of o.t.b at potrem, dessaiwada,bamonsai, otteabandh and owlleabandh in sanguem taluka.
Read moreStrengthening of left side approach road to mandve k.t. weir, tal.shrirampur dist.ahilyanagar
Strengthening
Read moreSupply and fixing of fabricated grill fencing and removing damaged fencing
Supply and fixing of fabricated grill fencing and removing damaged fencing
Read moreNa...m and r to nivali water supply scheme. replacing neoprene rubber seal, pad and repairs and painting to m. s. needles at k.t. wier on bav river.
Na...m and r to nivali water supply scheme. replacing neoprene rubber seal, pad and repairs and painting to m. s. needles at k.t. wier on bav river.
Read moreRemoving and fixing gi pipes at various location in beat no.185 g/north ward.
Removing and fixing gi pipes at various location in beat no.185 g/north ward.
Read moreTtps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Ttps mechii ahp uniti ii iii ash slurry pump house removing of worn out internals of seal water pump parts machining and fixing of new internals
Read moreDismantling old plaster,dismantling tile work,supplying and fixing movable,providing and applying gypsum-based punning,providing and applying white cement,providing and applying priming,wall painting with acrylic,providing and laying ceramic glazed floor tiles,providing and laying in position cement concrete,dismantling and removing existing wooden flooring,providing and fixing wooden sub-base floor,providing and fixing 4.5 mm thick pvc vinyl flooring,supplying and fixing movable badminton posts
Dismantling old plaster,dismantling tile work,supplying and fixing movable,providing and applying gypsum-based punning,providing and applying white cement,providing and applying priming,wall painting with acrylic,providing and laying ceramic glazed floor tiles,providing and laying in position cement concrete,dismantling and removing existing wooden flooring,providing and fixing wooden sub-base floor,providing and fixing 4.5 mm thick pvc vinyl flooring,supplying and fixing movable badminton posts
Read morePlainning for pop wiring in both direcor and meeting hall1,removing of existing wiring connections 2,fixing of mcb path for each room with proper piping 3,testing and demonistration 4,finishing with any adustments 5
Plainning for pop wiring in both direcor and meeting hall1,removing of existing wiring connections 2,fixing of mcb path for each room with proper piping 3,testing and demonistration 4,finishing with any adustments 5
Read moreRemoving dry or oil bound distemper, water proofing cement paint,providing and fixing ppr unions 25 mm,providing and placing on terrace at all floor levels polyethylene water storage tank,providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index of 105 on top of concrete roof,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs,providing and applying white cement based putty of average thickness 1 mm,wiring for circuit or submain wiring along with earth wire
Removing dry or oil bound distemper, water proofing cement paint,providing and fixing ppr unions 25 mm,providing and placing on terrace at all floor levels polyethylene water storage tank,providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index of 105 on top of concrete roof,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs,providing and applying white cement based putty of average thickness 1 mm,wiring for circuit or submain wiring along with earth wire
Read moreRenovation of the administration office building and fixing sheet roof with ms truss, removing of tinned roof & providing new gavalume sheet with truss on 3 nos godowns, renovating 2 nos ngrg godowns with providing galvalulme sheet roofing with truss, providing sheet roof over the 10 nos commercial shops and renovating the guest house at main market yard of apmc honnalli under action plan 2025-26
Renovation of the administration office building and fixing sheet roof with ms truss, removing of tinned roof & providing new gavalume sheet with truss on 3 nos godowns, renovating 2 nos ngrg godowns with providing galvalulme sheet roofing with truss, providing sheet roof over the 10 nos commercial shops and renovating the guest house at main market yard of apmc honnalli under action plan 2025-26
Read moreof your Industry type