Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Integration Of Micro Steam Turbine System In The Existing Vapour Absorption Refrigeration System (Vam)
|
| Description |
Setting Up Of A Pilot Project Title Integration Of Micro Steam Turbine System In The Existing Vapour Absorption Refrigeration System (Vam) For
Harnessing Waste Energy Into Electrical Energy At Dvc, Ktps
|
| Organisation | Damodar Valley Corporation | Public Sector Undertakings |
| Tender Id | 2024_DVC_209070_1 |
|
Reference Number |
DVC/Tender/Head Quarter/R and D/CMM/Works and Service/00001/Capital |
| Tender Fee | 0 |
| EMD | 7.07 Lakh |
| Tender Value | - |
| Place | DVC KTPS |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=228631 |
| Start Date | September 26, 2024 15:30 |
| End Date |
Expired
02/11/2024
Expired 714 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Single stage, vertical, back pressure steam turbine
Supply, erection and commissioning of single stage, vertical, back pressure steam turbine
Read moreSr. no. 1 rupture disc 50nb, part no. p36rd1026m for vapour absorption machine, make therlimited, model hs30c hu,sr. no. 2 rupture disc 80nb, part no. p36rd1027m for vapour absorption machine, make therlimited, model 2b 7k h,sr. no. 3 vacuum chain clamp, part no. hpx2c0101m for vapour absorption machine, make therlimited, model 2b 7k h,sr. no. 4 sample cylinder, part no. c007090001 for vapour absorption machine, make therlimited, model 2b 7k h,sr. no. 5 tool kit set, part no. c00745001c for vapour absorption machine, make therlimited, model 2b 7k h
Sr. no. 1 rupture disc 50nb, part no. p36rd1026m for vapour absorption machine, make therlimited, model hs30c hu,sr. no. 2 rupture disc 80nb, part no. p36rd1027m for vapour absorption machine, make therlimited, model 2b 7k h,sr. no. 3 vacuum chain clamp, part no. hpx2c0101m for vapour absorption machine, make therlimited, model 2b 7k h,sr. no. 4 sample cylinder, part no. c007090001 for vapour absorption machine, make therlimited, model 2b 7k h,sr. no. 5 tool kit set, part no. c00745001c for vapour absorption machine, make therlimited, model 2b 7k h
Read moreDe-scaling of condenser tubes by hydro jet cleaning of steam turbine condenser, whru at gas turbine power station
As per tender documents
Read moreSitc of chiller & vfd integration with existing bms
Sitc of chiller & vfd integration with existing bms
Read moreProcurement for steam turbine coupling studs and bolts at dgps at ntpc dadri
Procurement for steam turbine coupling studs and bolts at dgps at ntpc dadri
Read moreMain steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Main steam turbine control fluid system spares for accumulator bladder assembly model: s-35-b-m50-c,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,main steam turbine control fluid system spares for accumulator bladder assembly model: s-55-b-m50-c-,drive turbine governing oil system spares for accumulator bladder assembly model: s-35-b-m50-c-v cap
Read moreDevelopment and integration of new scada hmi screen with existing scada system including programming
Development and integration of new scada hmi screen with existing scada system including programming
Read moreTtps mechii tm i unitiii overhauling of steam and condensate valves of turbine regeneration system during the forthcoming annual overhaul
Ttps mechii tm i unitiii overhauling of steam and condensate valves of turbine regeneration system during the forthcoming annual overhaul
Read moreTtps mechii tm ii unitiv kwu turbine inspection overhauling and commissioning of actuators of steam line valves during annual overhaul 2026 27
Ttps mechii tm ii unitiv kwu turbine inspection overhauling and commissioning of actuators of steam line valves during annual overhaul 2026 27
Read moreof your Industry type