Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
General Coir Development Infrastructure Development Project Construction Of Godown And Grill Work Of Existing Building At Arattupuzha Cvcs No A 561 General Civil Work
|
Description |
General Coir Development Infrastructure&Amp#X0d
Development Project Construction Of Godown&Amp#X0d
And Grill Work Of Existing Building At&Amp#X0d
Arattupuzha Cvcs No A 561 General Civil&Amp#X0d
Work
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_680304_1 |
Reference Number |
PWD/BLDG/TR/4501/2024_5_1_1/1 |
Tender Fee | 1235 |
EMD | 13990 |
Tender Value | |
Place | Haripad |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1220941 |
Start Date | March 19, 2025 21:30 |
End Date |
25/03/2025 ( Expired 85 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of property development buildings in land parcels at existing mandaveli bus depot and terminus including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works
Design and construction of 
 property development buildings in land parcels at existing mandaveli bus 
 depot and terminus including civil, architectural finishes, plumbing, e and m, 
 hvac, lifts and all associated works
Read moreDesign and construction of civil, structural, architecture, mep, hvac, lifts, landscaping and all associated works for establishment of integrated bus terminal cum commercial office development at vadapalani bus depot
Design and construction of civil, structural, architecture, mep, hvac, lifts, landscaping and all associated works for establishment of integrated bus terminal cum commercial office development at vadapalani bus depot
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of 2x500 mva, 400/220 kv sub-station at amber (jaipur-north) (distt.jaipur) including supply of all equipments/materials, erection (including civil works), testing and commissioning (on turnkey basis) against specification no. rvpn/ehv/b
Construction of 2x500 mva, 400/220 kv sub-station at amber (jaipur-north) (distt.jaipur) including supply of all equipments/materials, erection (including civil works), testing and commissioning (on turnkey basis) against specification no. rvpn/ehv/b
Read moreConstruction and beautification work of shopping complex at ward no 13 in front of sbi.
Construction and beautification work of shopping complex at ward no 13 in front of sbi.
Read moreRenovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3
Renovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3
Read moreConstruction of c.c. road and drain work at kailash vihar city center airtel office to income tex office ward no. 30 zone no. 11 file no. 207/25x3/6
Construction of c.c. road and drain work at kailash vihar city center airtel office to income tex office ward no. 30 zone no. 11 file no. 207/25x3/6
Read moreEmergency civil renovation works of room no-702 at 6th floor and room no-803 at 7th floor of crr building for coeai at iit kharagpur.
Emergency civil renovation works of room no-702 at 6th floor and room no-803 at 7th floor of crr building for coeai at iit kharagpur.
Read moreAAAAAAAAAA
Login to viewConstruction of 1 no. rcc framed structure five storied building after demolition of existing residential five storied dilapidated condemned kmda building(block no. 02) to rehabilitate 65 nos present dwelling families and thorough restoration and str
Read moreSitc of 2x60 kva ups with half hour backup including required civil and electrical work at greater noida extension center, knowledge park-ii, plot no. 20, greater noida campus, iitr with 03 years camc and buyback of 100 kva ups with old batteries
Sitc of 2x60 kva ups with half hour backup including required civil and electrical work at greater noida extension center, knowledge park-ii, plot no. 20, greater noida campus, iitr with 03 years camc and buyback of 100 kva ups with old batteries
Read moreof your Industry type