Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Water Supply Scheme In Kashedi Ghat Section Under Rehabilitation And Upgradation Of Kashedi Ghat Section Of Nh 17 New Nh No 66 To Four Lanes With Paved Shoulders From Existing Km 148.00 To 161.600 Including Construction Of Twin Tube Tunnel In Stat
|
| Description |
Water Supply Scheme In Kashedi Ghat Section Under Rehabilitation And Upgradation Of Kashedi Ghat Section Of Nh 17 New Nh No 66 To Four Lanes With Paved Shoulders From Existing Km 148.00 To 161.600 Including Construction Of Twin Tube Tunnel In Stat
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_829668_1 |
|
Reference Number |
NIT No. 04/EENHD/PEN/ 2216 /2024-25/ Date 04/10/2024 |
| Tender Fee | 500 |
| EMD | 96000 |
| Tender Value | - |
| Place | PEN |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=881048 |
| Start Date | December 06, 2024 15:30 |
| End Date |
Expired
16/12/2024
Expired 668 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engagement of user fee agency on the basis of cb through e-tender at nagampatti fp at km 196.650 of two lanes with paved shoulders tindivanam to krishnagiri section of nh-66 from km 37.600 to km 219.782 in tamil nadu
Engagement of user fee agency on the basis of cb through e-tender at nagampatti fp at km 196.650 of two lanes with paved shoulders tindivanam to krishnagiri section of nh-66 from km 37.600 to km 219.782 in tamil nadu
Read moreUpgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreWidening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Read moreUpgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Upgradation to 2 lane with paved shoulders of naliya narayan sarovar section from design km 220.773 to km 288.987 of nh 41 in the state of gujarat on epc mode.
Read moreUpgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Upgradation of chitrod-rapar-balasar section of nh-927c to two-lane with paved shoulders from design km 0.00 to km 57.848 in the state of gujarat on epc mode.
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreConsultancy services for preparation of dpr for upgradation to two lanes with paved shoulder of nh-953 from km 0/00 (songarh, junction with nh-53) to km 61.658 (ahwa) in the state of gujarat
Consultancy services for preparation of dpr for upgradation to two lanes with paved shoulder of nh-953 from km 0/00 (songarh, junction with nh-53) to km 61.658 (ahwa) in the state of gujarat
Read moreBalance work of rehabilitation and up-gradation to 2 lane road with paved shoulders configuration for pacharal mandangad mhapral rajewadi section of nh-965dd upto junction of nh-66 ch 22700 m to ch 75100 m and ambadave connector spur connecting
Balance work of rehabilitation and up-gradation to 2 lane road with paved shoulders configuration for pacharal mandangad mhapral rajewadi section of nh-965dd upto junction of nh-66 ch 22700 m to ch 75100 m and ambadave connector spur connecting
Read moreConsultancy services for authoritys engineer for upgradation to 2 -lane with paved shoulders from km. 220.773 to 288.987 (naliya-narayan sarovar stretch) of nh-41 in the state of gujarat on epc mode
Consultancy services for authoritys engineer for upgradation to 2 -lane with paved shoulders from km. 220.773 to 288.987 (naliya-narayan sarovar stretch) of nh-41 in the state of gujarat on epc mode
Read moreRehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis
Rehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis
Read moreof your Industry type