Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renovation Of Flooring Works In Residential Quarters At Ca Rajkot
|
| Description |
Renovation Of Flooring Works In Residential Quarters At Ca Rajkot
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_AAI_159091_1 |
|
Reference Number |
AAI/WR/RAJ/ENGG/C/SM/FTW/23-24 |
| Tender Fee | 1180 |
| EMD | 1.18 Lakh |
| Tender Value | - |
| Place | Civil Engineering Office Rajkot Airport, Rajkot |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | June 29, 2023 15:00 |
| End Date |
Expired
20/07/2023
Expired 1163 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs raidurg, serilingampally (m) in ranga reddy district
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs raidurg, serilingampally (m) in ranga reddy district
Read moreRepairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs miyapur, serilingampally (m) in ranga reddy district
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs miyapur, serilingampally (m) in ranga reddy district
Read moreRepairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs darga (um), serilingampally (m) in ranga reddy district
Repairs to class rooms and other infrastructure facilities and for completion of the balance works at zphs darga (um), serilingampally (m) in ranga reddy district
Read moreSupply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreRenovation of flooring works in residential quarters at ca rajkot
Renovation of flooring works in residential quarters at ca rajkot
Read moreRenovation of flooring works at e-type & d-type quarters at brbnmpl, salboni
E-tenders are invited from eligible and qualified tenderers meeting qualification criteria for procurement of the following works. mstc event no.: brbnmpl/salboni press/mmd/5/24-25/et/13[renovation of flooring works]
Read moreRenovation of ground in gangotry complex iocl residential colony at wrpl rajkot
Renovation of ground in gangotry complex iocl residential colony at wrpl rajkot
Read moreof your Industry type