Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Stabilization And Improvement Of 33k V Lines Of Various Divisions Of Kpdcl (Pddss2627100229) By Way Of Stablization Of Kralpora Line From Upper Nechiyan Bridge Onwards
|
| Description |
Stabilization And Improvement Of 33k V Lines Of Various Divisions Of Kpdcl (Pddss2627100229) By Way Of Stablization Of Kralpora Line From Upper Nechiyan Bridge Onwards
|
| Organisation | DC-PDD | CE-M and RE Wing Kashmir | North Sopore | STD-Sopore |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 2001 |
| EMD | 1.02 Lakh |
| Tender Value | 51 Lakh |
| Place | Jammu and Kashmir |
| Link | Login to view |
| Start Date | October 03, 2026 21:30 |
| End Date |
Open
26/10/2026
11 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Stabilization and improvement of 33kv lines of various divisions of kpdcl (pddss2627100229) by way of stabilization of 33 kvamargrah-bandipora line (from grid station amargarh to receiving station watlab)
Stabilization and improvement of 33kv lines of various divisions of kpdcl (pddss2627100229) by way of stabilization of 33 kvamargrah-bandipora line (from grid station amargarh to receiving station watlab)
Read moreAugmentation of 33kv lines to overcome lcp constraints for various divisions of kpdcl by way of thickening of 33kv sidco line from 100 mm sq to 200 mm sq under ut capex
Augmentation of 33kv lines to overcome lcp constraints for various divisions of kpdcl by way of thickening of 33kv sidco line from 100 mm sq to 200 mm sq under ut capex
Read moreAugmentation of 33 kv lines to overcome lcp constraints for various divisions of kpdcl -33 kv badampora-preng madwan line from army camp safapora onwards-pddss2627100226
Augmentation of 33 kv lines to overcome lcp constraints for various divisions of kpdcl -33 kv badampora-preng madwan line from army camp safapora onwards-pddss2627100226
Read moreConstruction/ upgradation of 33 kv lines to overcome lcp constraints for various division of kpdcl. augmentation of 33kv nihalpora-markundal line from grid onwards pddss2627100226
Construction/ upgradation of 33 kv lines to overcome lcp constraints for various division of kpdcl. augmentation of 33kv nihalpora-markundal line from grid onwards pddss2627100226
Read moreAugmentation/stabilization of 33kv awantipora line by way of replacement of existing conductor by 200sqmm acsr and replacement of undersize and damaged poles from grid station awantipora to receiving station awantipora under stabilization of 33kv lin
Augmentation/stabilization of 33kv awantipora line by way of replacement of existing conductor by 200sqmm acsr and replacement of undersize and damaged poles from grid station awantipora to receiving station awantipora under stabilization of 33kv lin
Read moreImprovement / stabilization/restoration of ht / lt network in sub divisions as a measure of winter preparedness for the fy 2023-24 falling under jurisdiction of kpdcl o and m division awantipora .
Improvement / stabilization/restoration of ht / lt network in sub divisions as a measure of winter preparedness for the fy 2023-24 falling under jurisdiction of kpdcl o and m division awantipora .
Read moreStabilization of 33kv wanganpora kawdara mughal masjid line partially by way of reconductoring of 0.15 acsr conductor to 0.2 acsr from eidgah to kawdara receiving station (phase i)
Stabilization of 33kv wanganpora kawdara mughal masjid line partially by way of reconductoring of 0.15 acsr conductor to 0.2 acsr from eidgah to kawdara receiving station (phase i)
Read moreExtension of 33kv line from peernia to barrage along with renovation/stabilization of 33kv line by way of replacement of wooden and lattice poles by st poles along with creation of 100kva 33/.43kv substation at barrage.
Extension of 33kv line from peernia to barrage along with renovation/stabilization of 33kv line by way of replacement of wooden and lattice poles by st poles along with creation of 100kva 33/.43kv substation at barrage.
Read moreStablization of 33kv mattan achabal line by way of replacement undersized poles and augmentation of conductor from acsr 0.1 dog to acsr 0.2 panther panther from gopalpora grid to nowgam receiving station (phase 1)
Stablization of 33kv mattan achabal line by way of replacement undersized poles and augmentation of conductor from acsr 0.1 dog to acsr 0.2 panther panther from gopalpora grid to nowgam receiving station (phase 1)station (phase-1)
Read moreof your Industry type