Tender Details
Particulars | Details |
---|---|
Title |
Erection Of 2 No Single Pole Mounted Dt Structure 1) 1 No Horticulture Service Under Tf Iiia1 Rural West Melur Section
|
Description |
Erection Of 2 No Single Pole Mounted Dt Structure 1) 1 No Horticulture Service Under Tf Iiia1 Rural West Melur Section
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_516439_1 |
Reference Number |
EE/ EAST/MEDC/MDU/033/2024-25 |
Tender Fee | 0 |
EMD | 1000 |
Tender Value | |
Place | Melur |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=614541 |
Start Date | January 03, 2025 23:30 |
End Date |
09/01/2025 ( Expired 148 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreRepair and replacement of lt panels capacitor panels mccbs dbs and allied works at cair dca complex dad qtrs and service centre no 3 area under ge i r and d west bengaluru
Repair and replacement of lt panels capacitor panels mccbs dbs and allied works at cair dca complex dad qtrs and service centre no 3 area under ge i r and d west bengaluru
Read moreRepair replacement and maintenance of ht switch gears, ht distribution system, 2/4 pole structure earthings ht cable and transformers at trisul line, chq, signal centre, 3tb under 1eme centre area and repair replacement maintenance of ht switch ge
Repair replacement and maintenance of ht switch gears, ht distribution system, 2 4 pole structure earthings ht cable and transformers at trisul line, chq, signal centre, 3tb under 1eme centre area and repair replacement maintenance of ht switch ge
Read moreConstruction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode
Read moreRepairs replacement nd maintenance gang operated switch 2 4 pole structure ht cable transformers, calibration of vcbs equipment and body earthing and ht switch gears, ht distributions system, earthings at bowenpally area under age em-i area of g
Repairs replacement maintenance gang operated switch 2 4 pole structure ht cable transformers, calibration of vcb s equipment and body earthing and ht switch gears, ht distributions system, earthings at bowenpally area under age em-i area of g
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreConstruction of pm shri single lab of size 7 x 10.60 mtr at kendriya vidyalaya no 1 armapur under ge (i) kanpur
Construction of pm shri single lab of size 7 x 10.60 mtr at 
 kendriya vidyalaya no 1 armapur under ge (i) kanpur
Read moreBalance work of rest house no.1 and 2 and campus devopment work under west sub dn. bhopal
Balance work of rest house no.1 and 2 and campus devopment work under west sub dn. bhopal
Read moreCon of valley gutter godown no. 1 and 2 (wooden truss) into single span by tubular steel truss along with replacement of gi/asbestos sheet roofing with profile sheet roofing of godown no. 1, 2, mini shed, isolation shed at fsd darbhanga
Con of valley gutter godown no. 1 and 2 (wooden truss) into single span by tubular steel truss along with replacement of gi/asbestos sheet roofing with profile sheet roofing of godown no. 1, 2, mini shed, isolation shed at fsd darbhanga
Read moreof your Industry type