Tender Details

Particulars Details
Title
Ttps Es Em Iii Charges For Erection Testing And Commissioning Of 415 V 630 A Air Circuit Breaker In The Existing 415 Volts 75k W Lt Modules In Sea Water Booster Pumps 4 A And 4 B And Condenser Vacuum Pump 1 Of Uss Bus 4 A In Unit Iv
Description
Ttps Es Em Iii Charges For Erection Testing And Commissioning Of 415 V 630 A Air Circuit Breaker In The Existing 415 Volts 75k W Lt Modules In Sea Water Booster Pumps 4 A And 4 B And Condenser Vacuum Pump 1 Of Uss Bus 4 A In Unit Iv
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_463958_1
Reference
Number
CE/SE/ES /TTPS /No.197/2024-25
Tender Fee 0
EMD 2300
Tender Value
Place TTPS
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=551402
Start Date July 18, 2024 22:40
End Date

02/08/2024 ( Expired 263 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ttps es circle em ii complete servicing and defect rectification of 5 nos 500v 3200 amps l t make air circuit breakers and rewinding of mv 1 coils in esp ahp stage i ii and clwph lt swgrs

Ttps es circle em ii complete servicing and defect rectification of 5 nos 500v 3200 amps l t make air circuit breakers and rewinding of mv 1 coils in esp ahp stage i ii and clwph lt swgrs

Read more
Ttps es circle em ii erection and commissioning of 3 nos lt 3 phase 75 kw lt induction motors heavy oil pump motors flame proof in place of existing life served motors at fuel oil pump house i

Ttps es circle em ii erection and commissioning of 3 nos lt 3 phase 75 kw lt induction motors heavy oil pump motors flame proof in place of existing life served motors at fuel oil pump house i

Read more
Ttps es em iii dismantling overhauling re erection and load testing of 2 nos 2 tonne capacity wire rope electric hoist at esp ab and esp cd pass in unit iv esp roof top floor area

Ttps es em iii dismantling overhauling re erection and load testing of 2 nos 2 tonne capacity wire rope electric hoist at esp ab and esp cd pass in unit iv esp roof top floor area

Read more
Ttps es em iii charges for providing louver assembly for exhaust fan holes with frame in switch yard ii of unit iv and v

Ttps es em iii charges for providing louver assembly for exhaust fan holes with frame in switch yard ii of unit iv and v

Read more
Ttps es circle em i painting of unit i and iiis lt switchgear uss sss and n e and dg emergency bus panels external surface

Ttps es circle em i painting of unit i and iiis lt switchgear uss sss and n e and dg emergency bus panels external surface

Read more
Ttps operation circle cad attending repair and overhauling of raw water pump a, b and c in glr iii and fabrication, machining and supply of gland bolts nut with washer for sea water booster pumps in unit-iv and v acw system

Ttps operation circle cad attending repair and overhauling of raw water pump a, b and c in glr iii and fabrication, machining and supply of gland bolts nut with washer for sea water booster pumps in unit-iv and v acw system

Read more
Ttps es circle em ii charges for erection of newly fabricated hinges and renewal of damaged doors in ahp stage i ii ciwph foph i and esp-i ii iii lt swgr panels

Ttps es circle em ii charges for erection of newly fabricated hinges and renewal of damaged doors in ahp stage i ii ciwph foph i and esp-i ii iii lt swgr panels

Read more
Ttps es em iii cleaning the outer surface of 415 volt boiler side lt motors in unit iv and v

Ttps es em iii cleaning the outer surface of 415 volt boiler side lt motors in unit iv and v

Read more
Ttps es em iii charges for cleaning of cable trays and cables of 415v ac 220 v and 24v dc switchgear rooms in unit iv and v area for the period from 01 07 2024 or date of commencement of work up to 31 03 2025

Ttps es em iii charges for cleaning of cable trays and cables of 415v ac 220 v and 24v dc switchgear rooms in unit iv and v area for the period from 01 07 2024 or date of commencement of work up to 31 03 2025

Read more
Ttps es em iii charges for erection testing and commissioning of 415 v 630a air circuit breaker in the existing 415 volts 75kw lt modules in sea water booster pumps 4a and 4b and condenser vacuum pump 1 of uss bus 4a in unit iv

Ttps es em iii charges for erection testing and commissioning of 415 v 630a air circuit breaker in the existing 415 volts 75kw lt modules in sea water booster pumps 4a and 4b and condenser vacuum pump 1 of uss bus 4a in unit iv

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise