Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Installation Of Solar Panel System In Court Complex Of The State Of Punjab And Haryana Under E Courts Phase Iii Projects (Judicial Court Complex Naraingarh In Distt. Ambala).
|
Description |
Installation Of Solar Panel System In Court Complex Of The State Of Punjab And Haryana Under E Courts Phase Iii Projects (Judicial Court Complex Naraingarh In Distt. Ambala).
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2024_HRY_403173_1 |
Reference Number |
202449314FA2 E314 421A AD27 1FA14E733D9F663BAR |
Tender Fee | 2180 |
EMD | 22240 |
Tender Value | |
Place | Ambala Cantt |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=479593 |
Start Date | October 12, 2024 14:30 |
End Date |
21/10/2024 ( Expired 243 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Petty repairs and day to day maintenance of b/r nature and certain b/r repairs in e/m installation in tech area under age b/r-ii at af stn bhisiana
Petty repairs and day to day maintenance of b/r nature and certain b/r repairs in e/m installation in tech area under age b/r-ii at af stn bhisiana
Read moreRepair maint of bldg lightening protection system and connected earthing at zone a and b area and comprehensive maint of ug cable panel oh line and earthing at dett b and dett iii at rajouri under ge 862 ews
Repair maint of bldg lightening protection system and connected earthing at zone a and b area and comprehensive maint of ug cable panel oh line and earthing at dett b and dett iii at rajouri under ge 862 ews
Read moreIndependent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Read moreReplacement of existing conventional fitting with led fitting in judicial court complex at ajnala distt amritsar
Replacement of existing conventional fitting with led fitting in judicial court complex at ajnala &#x0d distt amritsar
Read moreDesign engineering and procurement of construction of integrated court complex in different districts of up india on epc mode i shamli 23 courts ii auraiya 37 courts iii hathras 44 courts
Design engineering and procurement of construction of integrated court complex in different districts of up india on epc mode i shamli 23 courts ii auraiya 37 courts iii hathras 44 courts
Read moreRepair / maintenance of e/m installation, ug cables, lt panel boards and misc works at hemrl under ge (i) rnd pashan
Repair / maintenance of e/m installation, ug cables, lt panel boards and misc works at hemrl under ge (i) rnd pashan
Read moreUnder iii phase work of gravity sewer line from sector-d tila mode to sps and gravity sewer line work from sector-e and f to sps at indraprasth scheme.
Under iii phase work of gravity sewer line from sector-d tila mode to sps and gravity sewer line work from sector-e and f to sps at indraprasth scheme. &#x0d &#x0d
Read moreExecution of works of rooftop solar pv installation in the residential sector under pm surya ghar muft bijli yojna in the states of meghalaya, mizoram and tripura
Execution of works of rooftop solar pv installation in the residential sector under pm surya ghar muft bijli yojna in the states of meghalaya, mizoram and tripura
Read moreSitc of ac machines in 11 courts and chambers of siliguri sub- divisional court and installation of one water purifier/cooler at the judges residential quarter (judges enclave) hakimpara, siliguri darjeeling. - ac arrangement (1st phase)
Sitc of ac machines in&#x0d 11 courts and&#x0d chambers of siliguri sub-&#x0d divisional court and&#x0d installation of one water&#x0d purifier/cooler at the&#x0d judges residential&#x0d quarter (judges enclave)&#x0d hakimpara, siliguri&#x0d darjeeling. - ac&#x0d arrangement (1st phase)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreof your Industry type