Tender Details
Particulars | Details |
---|---|
Title |
Balance Electrical Work In C/W Soft Up Gradation/Improvement Of Rupnagar, Malerkotla &Amp Ambala City Railway Station Under Amrit Bharat Station Scheme.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73971705 |
Reference Number |
30-Elect-T-48-2023-24 |
Tender Fee | 0 |
EMD | 1.85 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73971705/viewNitPdf_4501000.pdf |
Start Date | March 09, 2024 00:07 |
End Date |
01/04/2024 ( Expired 407 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Lining of w/c at outlet rd ...
Estimate for construction of w/c at outlet rd 2900/l direct barsola feeder in the land of dhan raj s/o gopala field to sadhu s/o ramchander field (14 acre) village baroda (under mplad scheme)
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreWork of attending to resolving the fuse off call complaints lt/ht line breakdowns for restoration of electrical power supply in the various divisions under city circle amritsar and east division amritsar under suburban circle amritsar
Work of attending to resolving the fuse off call complaints lt/ht line breakdowns for restoration of electrical power supply in the various divisions under city circle amritsar and east division amritsar under suburban circle amritsar
Read moreUnder the state smart city scheme, construction work of yatri niwas on nazul land for the convenience of devotees in the municipal corporation ayodhya dham of ayodhya distric
Under the state smart city scheme, construction work of yatri niwas on nazul land for the convenience of devotees in the municipal corporation ayodhya dham of ayodhya distric
Read moreWork for providing bisalpur water to gandhi nagar railway station by 200 mm feeder from gandhi nagar pump house under the jurisdiction of city div-i(s), gandhi nagar, jaipur.
Work for providing bisalpur water to gandhi nagar railway station by 200 mm feeder from gandhi nagar pump house under the jurisdiction of city div-i(s), gandhi nagar, jaipur.
Read moreRetrofitting of balance work of water supply scheme as per requirement of site situation instected by sub engineer/assistant engineer under jjm in block chourai and bichhua, distt. chhindwada (repair work totally not allowed). (as per boq)
Retrofitting of balance work of water supply scheme as per requirement of site situation instected by sub engineer/assistant engineer under jjm in block chourai and bichhua, distt. chhindwada (repair work totally not allowed). (as per boq)
Read moreRetrofitting of balance work of water supply scheme as per requirement of site situation instected by sub engineer/assistant engineer under jjm in block sausar and pandhurna, distt. chhindwada (repair work totally not allowed). (as per boq)
Retrofitting of balance work of water supply scheme as per requirement of site situation instected by sub engineer/assistant engineer under jjm in block sausar and pandhurna, distt. chhindwada (repair work totally not allowed). (as per boq)
Read moreRetrofitting of balance work of water supply scheme as per requirement of site situation instected by sub engineer/assistant engineer under jjm in block chhindwara and mohkhed, distt. chhindwada (repair work totally not allowed). (as per boq)
Retrofitting of balance work of water supply scheme as per requirement of site situation instected by sub engineer/assistant engineer under jjm in block chhindwara and mohkhed, distt. chhindwada (repair work totally not allowed). (as per boq)
Read moreof your Industry type