Tender Details

Particulars Details
Title
Verification Of Annual Energy Consumption Return (2024 25) Under Perform, Achieve And Trade Scheme
Description
Verification Of Annual Energy Consumption Return (2024 25) Under Perform, Achieve And Trade Scheme
Organisation Rashtriya Ispat Nigam Limited,Visakhapatnam | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 0
Tender Value
Place VISAKHAPATNAM
Link

AAAAAAAAAA

Login to view
Start Date April 24, 2025 19:30
End Date

16/05/2025 ( 2 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders

Supply, delivery and installation overhead pole at para water supply scheme (intake site) and other allied works under pmd, phe dte.

Read more
Construction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan

Construction of 2l- ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan

Read more
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu

Read more
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25

Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25

Read more
Conservation and rejuvenation of pamaya river under amrut 2.0 scheme at banmore

Conservation and rejuvenation of pamaya river under amrut 2.0 scheme at banmore

Read more
Construction of technical buildings and allied infrastructure under ge (p) nagrota

Construction of technical buildings and allied infrastructure under ge (p) nagrota

Read more

Annual o and m of jalangi zone-ii, jalangi zone-iii, jalangi zone-iv and narashingapur zone- ii piped water supply scheme in jalangi block under murshidabad division phe dte.

Read more
Urgent protection to hill side slope between km.532/300 to km 535/600 on nh-66 in the state of goa under nh(o) annual plan 2024-25.

Urgent protection to hill side slope between km.532/300 to km 535/600 on nh-66 in the state of goa under nh(o) annual plan 2024-25.

Read more
Implementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme

Implementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme

Read more
Provn of retaining wall and drain between certain unit locations in the aor of age b/r-ii under ge 864 ews, job no w/evi-06/bb cantt/2024-25

Cwek/token-16/864 ews/2025-26 provn of retaining wall and drain between certain unit locations in the aor of age b/r-ii under ge 864 ews, job no w/evi-06/bb cantt/2024-25

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise