Tender Details
Particulars | Details |
---|---|
Title |
Rectification Works By Attending Patch Up To The Existing Damaged 275 N Road From Unit 3 Compound Wall To Storm Water Pump House And Resurfacing The Existing Black Topping Road At Ttps
|
Description |
Rectification Works&Amp#X0d
By Attending Patch Up To The Existing Damaged 275 N Road From&Amp#X0d
Unit 3 Compound Wall To Storm Water Pump House And&Amp#X0d
Resurfacing The Existing Black Topping Road At Ttps
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_491305_1 |
Reference Number |
CE SE C TTPS Spec. No 203 24 25 |
Tender Fee | 0 |
EMD | 7600 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=583697 |
Start Date | October 05, 2024 23:30 |
End Date |
21/10/2024 ( Expired 202 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing and laying of 1000x1000 mm precast box culvert storm water drain from azad bhawan road cut to indraprastha police station pump house under sub division-3 of division c and nd- roads, new delhi.
Providing and laying of 1000x1000 mm precast box culvert storm water drain from azad bhawan road cut to indraprastha police station pump house under sub division-3 of division c and nd- roads, new delhi.
Read moreMaintenance of raw water conveyance and head works by way of replacing of damaged gi pipes including rectification to the existing pipe line at baldar , sheikhnagi of wss hakwas kb pora gujjarbasti under m and r
Maintenance of raw water conveyance and head works by way of replacing of damaged gi pipes including rectification to the existing pipe line at baldar , sheikhnagi of wss hakwas kb pora gujjarbasti under m and r
Read moreConstruction of compound wall around the ohc water supply pump house of v.p.a
Construction of compound wall in place of damaged existing chain link mesh fencing around the ohc water supply pump house of
 visakhapatnam port authority
Read moreDr.nttps-om-civil-clearing the light jungle in road no. 1 4, abc road, water treatment plant, fire station, both sides of compound wall from new gate to budameru near cooling towers via old gate areas 220kv switch yard bays empty bays and cleaning of storage tanks and sludge pits of bcw pump house stage-iii during the year 2025-26.
Dr.nttps-om-civil-clearing the light jungle in road no. 1 4, abc road, water treatment plant, fire station, both sides of compound wall from new gate to budameru near cooling towers via old gate areas 220kv switch yard bays empty bays and cleaning of storage tanks and sludge pits of bcw pump house stage-iii during the year 2025-26.
Read moreRemoval and disposal of fly ash, silt, slush deposits etc. from the drains around administrative building complex, along 275 n road up to unit 3 compound wall, along 302.5w road and inside stores area for the period from 01.04.2025 to 31.03.2026
Removal&#x0d and disposal of fly ash, silt, slush deposits etc. from the drains&#x0d around administrative building complex, along 275 n road up to&#x0d unit 3 compound wall, along 302.5w road and inside stores&#x0d area for the period from 01.04.2025 to 31.03.2026
Read moreFabrication n fixing of shed for pump n motor (550v, 3ph, 60hp, make-kirloskar) dedicated for supplying water to water tanker filling point, er, grinder machine, etc and replacement of existing damaged sheets near clean water pump house incl
Fabrication n fixing of shed for pump n motor (550v, 3ph, 60hp, make-kirloskar) dedicated for supplying water to water tanker filling point, er, grinder machine, etc and replacement of existing damaged sheets near clean water pump house incl
Read moreSweeping and cleaning the road around the administrative building complex, road from main gate and 275 n road up to unit 3 compound wall for the period from 01.04.2025 to 31.03.2026
Sweeping&#x0d and cleaning the road around the administrative building&#x0d complex, road from main gate and 275 n road up to unit 3&#x0d compound wall for the period from 01.04.2025 to 31.03.2026
Read morePeriodical cleaning of the storm water drains in unit 1 to 3 including storm water channel near storm water pump house for the period from 01.04.2025 to 31.03.2026
Periodical&#x0d cleaning of the storm water drains in unit 1 to 3 including storm water channel near storm water pump house for the period from 01.04.2025 to 31.03.2026
Read moreTtps mech ii ahp unit i ii iii breakdown works in ash water pump house overhauling of bottom ash water pump high pressure water pump low pressure water pump, sump pump and valves for the period from 01 04 25 to 31 03 26
Ttps mech ii ahp unit i ii iii breakdown works in ash water pump house overhauling of bottom ash water pump high pressure water pump low pressure water pump, sump pump and valves for the period from 01 04 25 to 31 03 26
Read moreTender for repair and maintenance of road from security post to rcc culvert by providing of soiling cement concrete topping and raising of heifght of existing protection wall to pr over topping of water at intake of khauli power house
Tender for repair and maintenance of road from security post to rcc culvert by providing of soiling cement concrete topping and raising of heifght of existing protection wall to pr over topping of water at intake of khauli power house
Read moreof your Industry type