Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Custom Bid Invitation: Arc For Decoking Of Dcu Furnace Heater Tubes 🛠️ Indian Oil Corporation Limited, Under The Aegis Of The Ministry Of Petroleum And Natural Gas, Is Seeking Proposals For The Decoking Of Dcu Furnace Heater Tubes By Pigging Technology At Hal. 🗓️ Proposal Submission Deadline: May 28, 2024, 3:00 Pm Service Providers With Expertise In This Specialized Area Are Invited To Submit Detailed Proposals, Outlining Their Methodology, Experience, And Competitive Pricing. Keywords: Indian Oil Corporation Limited, Decoking, Dcu Furnace Heater Tubes, Pigging Technology, Ministry Of Petroleum And Natural Gas, Government Contract, Proposal Submission| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Arc For Decoking Of Dcu Furnace Heater Tubes By Pigging Technology At Hal
|
| Description |
|
| Organisation | INDIAN OIL CORPORATION LIMITED | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/4942467 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | 2 Crore |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | May 14, 2024 21:23 |
| End Date |
Expired
28/05/2024
Expired 868 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|
| 1 | Almighty Manpower & Security Services | 28-05-2024 14:51:07 | MSE | Disqualified |
| 2 | Angel Manpower & Security Services | 28-05-2024 14:43:21 | MSE | Disqualified |
| 3 | CR3 (INDIA) PRIVATE LIMITED | 28-05-2024 14:21:40 | N/A | Qualified |
| 4 | KING AND ANGEL DIAMOND SERVICES PRIVATE LIMITED | 28-05-2024 14:50:22 | MSE | Disqualified |
| 5 | MAGICROT INDUSTRIAL SERVICES PRIVATE LIMITED | 27-05-2024 14:09:19 | MSE | Qualified |
| 6 | PLANT-TECH INDUSTRIAL SERVICES LIMITED | 27-05-2024 13:07:00 | MSE | Qualified |
| 7 | SAFE SHADOW SECURITY SERVICES | 28-05-2024 14:39:31 | MSE | Disqualified |
| 8 | Sky High Secure Security Services | 28-05-2024 14:42:59 | MSE | Disqualified |
| 9 | SMVD Group Secure Services | 28-05-2024 14:47:35 | MSE | Disqualified |
| 10 | TRIPATHI BROTHERS SERVICES | 28-05-2024 14:13:03 | MSE | Disqualified |
| 11 | TRIPATHI BROTHERS SERVICES PRIVATE LIMITED | 28-05-2024 14:49:19 | MSE | Disqualified |
| 12 | VAIKUNTH GROUP ENTERPRISES | 28-05-2024 14:55:35 | MSE | Disqualified |
Arc of ball tubes mills bbd...
Annual rate contract for maintenance of ball tube mills and gravimetric feeder etc for 2x250 mw unit 7 and 8 ptps panipat
Read moreSupply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Read moreDesign, engineering, supply, erection, testing and commissioning 9 mva shell type furnace transformer for sub merged electric arc furnace of ferrochrome plant omc at jajpur road.
Design, engineering, supply, erection, testing and commissioning 9 mva shell type furnace transformer for sub merged electric arc furnace of ferrochrome plant omc at jajpur road.
Read moreTtps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Read moreControl valve characteristics,calibration of thermocouple,dynamic response of the u tube manometer,interacting non interacting system,proportional p and proportional integral pi controllers for flow and level control,time constant of the stirred tank heater,temperature control trainer with computer system,pressure control trainer,p i i p convertor,capacitance method,nephelometer or turbidimeter,hot air oven,muffle furnace,jar test apparatus,high volume air sampler pm10,fine particulate sampler pm2.5,biochemical oxygen demand analyzer,cod reflux apparatus with cod digester,bomb calorimeter,biogas digester or anaerobic digester,melting point apparatus,ball mill,air compressor,oil free vacuum pump,ultra violet flourescene inspection cabinet
Control valve characteristics,calibration of thermocouple,dynamic response of the u tube manometer,interacting non interacting system,proportional p and proportional integral pi controllers for flow and level control,time constant of the stirred tank heater,temperature control trainer with computer system,pressure control trainer,p i i p convertor,capacitance method,nephelometer or turbidimeter,hot air oven,muffle furnace,jar test apparatus,high volume air sampler pm10,fine particulate sampler pm2.5,biochemical oxygen demand analyzer,cod reflux apparatus with cod digester,bomb calorimeter,biogas digester or anaerobic digester,melting point apparatus,ball mill,air compressor,oil free vacuum pump,ultra violet flourescene inspection cabinet
Read moreCustom bid for services - arc for decoking of dcu furnace heater tubes by pigging technology at hal
Read more
Custom bid for services - rprc244131 rate contract for decoking by pigging of dcu furnace heaters
Read more
of your Industry type