Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Four Bar Polycentric Pneumatic Knee Joint
|
Description |
|
Organisation | Department of Defence | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | June 19, 2025 14:19 |
End Date |
10/07/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreEngineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di
Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di
Read moreConstruction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreIe services during o and m of the stretch tolling omt of four lane with paved shoulders of (i) nh-27 from kachugaon-rakhaldubi bus junction (ii) nh-27 from rakhaldubi bus junction-kaljharand (iii) nh-27 from kaljhar-pattarcharkuchi in assam
Ie services during o and m of the stretch tolling omt of four lane with paved shoulders of (i) nh-27 from kachugaon-rakhaldubi bus junction (ii) nh-27 from rakhaldubi bus junction-kaljharand (iii) nh-27 from kaljhar-pattarcharkuchi in assam
Read moreDesign, engineering, manufacturing, testing, supply of two sets of 220kv complete emergency restoration system (ers) each having four towers (2 suspension and 2 tension).
Design, engineering, manufacturing, testing, supply of two sets of 220kv complete emergency restoration system (ers) each having four towers (2 suspension and 2 tension).
Read moreWork of complete overhauling of pneumatic mechanism system of 06 nos. 400 kv circuit breaker at 400 kv s/s banda.
Work of complete&#x0d overhauling of&#x0d pneumatic mechanism&#x0d system of 06 nos. 400&#x0d kv circuit breaker at&#x0d 400 kv s/s banda.
Read moreof your Industry type