Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Belt Cleaning Along The Periphery Of 9 Wl Belt Conveyor Belt From 15 R To 20 R To Rviib Seam At No 3 And 4 Pit Unit Of Kumardihi A Colliery
|
| Description |
Belt Cleaning Along The Periphery Of 9 Wl Belt Conveyor Belt From 15 R To 20 R To Rviib Seam At No 3 And 4 Pit Unit Of Kumardihi A Colliery
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_298271_1 |
|
Reference Number |
ECL/GM/BA/E TENDER/23-24/Min/248 Dt 10.01.2024 |
| Tender Fee | 0 |
| EMD | 1600 |
| Tender Value | - |
| Place | Kumardihi A Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=308940 |
| Start Date | January 11, 2024 23:30 |
| End Date |
Expired
22/01/2024
Expired 1000 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of two nos belt conveyor motor at 72l-11d 2nd belt conveyor, two nos starter running at 11( 2 )and72l belt conveyor at 3n4 incline ug of jhanjra project colliery
Replacement of two nos belt conveyor motor at 72l-11d 2nd belt conveyor, two nos starter running at 11( 2 )and72l belt conveyor at 3n4 incline ug of jhanjra project colliery
Read moreCleaning along 19l belt from 7wd to 19wd in rvii a seam at shyamsundarpur colliery.
Cleaning along 19l belt from 7wd to 19wd in rvii a seam at shyamsundarpur colliery.
Read more08 (eight) nos. vulcanizing joints for steel cord belt conveyor of mic, jhanjra project colliery.
08 (eight) nos. vulcanizing joints for steel cord belt conveyor of mic, jhanjra project colliery.
Read moreInstallation of belt conveyors for k13 panel of lhcm in rv seam of khottadih colliery, pandaveswar area
Installation of belt conveyors for k13 panel of lhcm in rv seam of khottadih colliery, pandaveswar area
Read morePreparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Preparation of belt roadway(8ln) and installation of 1000mm belt conveyor in main line of seam a at kurja ug mine of hasdeo area.
Read moreCustom bid for services - loading & transportation of 150 mtrs belt conveyor 330 mtrs belt conveyor 1000mm belt drivehead from surface and unloading, transportation & installation of same at 35le by 54 by 55 re seam v at saoner mine no 1 of saone..
Custom bid for services - loading & transportation of 150 mtrs belt conveyor 330 mtrs belt conveyor 1000mm belt drivehead from surface and unloading, transportation & installation of same at 35le by 54 by 55 re seam v at saoner mine no 1 of saone..
Read moreInstallation of power setup behind load centre in panel no. p1, p2, p6 and p10 of lhcm1 package in rviic seam of cm project at nakrakonda kumardihi b colliery under bankola area.
Installation of power setup behind load centre in panel no. p1, p2, p6 and p10 of lhcm1 package in rviic seam of cm project at nakrakonda kumardihi b colliery under bankola area.
Read moreRectification of gear coupling and rectification of loop-take-up unit and changing old vcb, starter of 4d belt in rvi seam of mic, jhanjra project colliery.
Rectification of gear coupling and rectification of loop-take-up unit and changing old vcb, starter of 4d belt in rvi seam of mic, jhanjra project colliery.
Read moreRepairing of five no pressure drum shell dia 215 mm x 1150 mm long shaft dia 75 mm of 1000 mm belt conveyors rvii and rviia seam installed in 3 and 4 incline j p colliery
Repairing of five no pressure drum shell dia 215 mm x 1150 mm long shaft dia 75 mm of 1000 mm belt conveyors rvii and rviia seam installed in 3 and 4 incline j p colliery
Read moreBelt cleaning along the periphery of 15r conveyor belt from 1wl to 12wl and along 6wl from 15r to 20r in rviib seam at no.3 and 4 pit unit of kumardihi a colliery.
Belt cleaning along the periphery of 15r conveyor belt from 1wl to 12wl and along 6wl from 15r to 20r in rviib seam at no.3 and 4 pit unit of kumardihi a colliery.
Read moreof your Industry type