Tender Details

Particulars Details
Title
Electrosurgical Hemostatic Forceps Colon Length
Description
Purchase Of Electrosurgical Hemostatic Forceps Colon Length
Organisation Municipal Corporation of Greater Mumbai | State Govt. and UT
Tender Id 2025_MCGM_1170948_1
Reference
Number
GE/830/N/ Dt.04.03.2025
Tender Fee 500
EMD 6000
Tender Value
Place Nair Hospital
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2034635
Start Date April 16, 2025 23:30
End Date

23/04/2025 ( Expired 20 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.

Construction of 4-lane gf western bypass from design km 0.000 (km 181.000 on nh-146) near lahdara village junction on nh-146 km 20.200 (km 223.200 on nh-44) near berkheri guru village junction on nh-44 of length-20.200 km in mp on ham.

Read more
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham

Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham

Read more
Independent engineer services for 4 laning of rajapalayam to shenkottai section of nh-744 in tamil nadu on ham (project length-68.3km)

Independent engineer services for 4 laning of rajapalayam to shenkottai section of nh-744 in tamil nadu on ham (project length-68.3km)

Read more
Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)

Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)

Read more
4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)

4 laning of marakkanam-puducherry section of nh-332a from km 62.000-km 108.047 in tamil nadu on ham (project length-46.047 km) (mahabalipuram-puducherry package-iii)

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Construction of nh353 j stretch from chandur bazarnaka to junctionwith nh 548 c (jasi rani chowk) in paratwada achalpur city to four lane with paved shoulder configuration on epc basis in the state of maharashtra length 6.19 km).

Read more
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise