Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Liner For Shaped Charge 90 Mm Opening Date Extension From 09 Aug 2024 To 12 Aug 2024
|
| Description |
Liner For Shaped Charge 90 Mm Opening Date Extension From 09 Aug 2024 To 12 Aug 2024
|
| Organisation | Department of Defence Production | Central Govt. Ministry/Department |
| Tender Id | 2024_DoDP_767490_1 |
|
Reference Number |
GEM/2024/B/4825841/A6 |
| Tender Fee | 0 |
| EMD | 6.19 Lakh |
| Tender Value | |
| Place | ORDNANCE FACTORY CHANDA |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1071245 |
| Start Date | August 09, 2024 20:40 |
| End Date |
Expired
12/08/2024
Expired 681 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tooth spacing k value checking go & no go gauge for bull gear 107 teeth (mating shaft pinion- 21 teeth) for wag-9 / wag-9 hc loco. size: go: 317.09/317.17 mm & no go (service limit): 316.49 mm. ref: rdso drawing no. sk.dp-3848. material: tool steel - is- 3748/90, hardness: 40/45 hrc and supply with calibration certificate. acceptable make: pex/ganapathy /pie /jyoti enterprises/ prasad only
For complete deion and other details, please refer to tender
Read moreSupply and commissioning of manual and robotic system capable of inspecting water supply pipelines with diameters ranging from 80 mm to 2200 mm along with the operation and maintenance support for 3 years with all setup including vehicle and staff
Supply and commissioning of manual and robotic system capable of inspecting water supply pipelines with diameters ranging from 80 mm to 2200 mm along with the operation and maintenance support for 3 years with all setup including vehicle and staff
Read moreEmpty hardware for influence mine opening date extension from 09 aug 2024 to 12 aug 2024
Empty hardware for influence mine opening date extension from 09 aug 2024 to 12 aug 2024
Read moreHaped charge 30 mm opening date extension form 06 aug 2024 to 10 aug 2024
Haped charge 30 mm opening date extension form 06 aug 2024 to 10 aug 2024
Read moreXylole opening date extension from 09 aug 2024 to 16 aug 2024
Xylole opening date extension from 09 aug 2024 to 16 aug 2024
Read moreDesmodure rc opening date extension from 07 aug 2024 to 12 aug 2024
Desmodure rc opening date extension from 07 aug 2024 to 12 aug 2024
Read moreAdditive liner for full charge 130mm opening date extension from 12 apr 2025 to 17 apr 2025
Additive liner for full charge 130mm opening date extension from 12 apr 2025 to 17 apr 2025
Read morePerforated additive liner opening date extension from 09 oct. 2024 to 15 oct. 2024
Perforated additive liner opening date extension from 09 oct. 2024 to 15 oct. 2024
Read morePhosphorus white opening date extension from 26 aug. 2024 to 29 aug. 2024
Phosphorus white opening date extension from 26 aug. 2024 to 29 aug. 2024
Read moreContainer clearing charge opening date extension from 07 mar 2024 to 12 mar 2024
Container clearing charge opening date extension from 07 mar 2024 to 12 mar 2024
Read moreof your Industry type