Tender Details
Particulars | Details |
---|---|
Title |
Reconstruction Of Major Bridge At Lhs Of Km. 79.520 (Existing) (Span (7.22.85) (3.27.40) Width Of Structure Including Crash Barrier 12.5m) Section Of Nh 44 (Old Nh7) In The State Of Maharashtra On Epc Mode
|
Description |
Reconstruction Of Major Bridge At Lhs Of Km. 79.520 (Existing) (Span (7.22.85) (3.27.40) Width Of Structure Including Crash Barrier 12.5m) Section Of Nh 44 (Old Nh7) In The State Of Maharashtra On Epc Mode
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2025_NHAI_232368_1 |
Reference Number |
2025/NHIPMPL /MJB-BWK |
Tender Fee | 11800 |
EMD | 21 Lakh |
Tender Value | |
Place | NHIPMPL |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=262492 |
Start Date | April 08, 2025 22:50 |
End Date |
05/05/2025 ( Expired 32 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of bypass to gangaikonda cholapuram in kallagam to meensurutti section of nh-81 (old nh-227) in tamil nadu on epc mode
Construction of bypass to gangaikonda cholapuram in kallagam to meensurutti section of nh-81 (old nh-227) in tamil nadu on epc mode
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreConsultancy services for authority engineer for supervision of up-gradation of pichhore-dinara section of nh-346 from km 292.750 to 334.550 to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Consultancy services for authority engineer for supervision of up-gradation of pichhore-dinara section of nh-346 from km 292.750 to 334.550 to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreCurve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Curve improvements at km 41.500 on nh-69 black spot id ka 05 37 and construction of rcc culvert at km 35.600 on honnasagar section in the state karnataka on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreof your Industry type