Tender Details
Particulars | Details |
---|---|
Title |
Execution Of Balance Works In Package Water Proofing Of Roof And Plastering Of Parapet Wall Of Quarters At Kadapa Substation
|
Description |
Execution Of Balance Works In Package Water Proofing Of Roof And Plastering Of Parapet Wall Of Quarters At Kadapa Substation
|
Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
Tender Id | 23617 |
Reference Number |
SR-I-CnM-WC-3487/RfX no:5002003202 |
Tender Fee | 2000 |
EMD | 56000 |
Tender Value | |
Place | Kadapa Substation |
Link | https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=bc76ddb6-29b0-4e87-a885-8e4c4f037a80 |
Start Date | December 27, 2023 16:30 |
End Date |
25/01/2024 ( Expired 473 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance of civil works- addition, alteration modification of various buildings and other structures of shastri park staff quarters, transit hostel accommodation, prakriti park and depot and staff quarters approach road at shastri park.
Maintenance of civil works- addition, alteration modification of various buildings and other structures of shastri park staff quarters, transit hostel accommodation, prakriti park and depot and staff quarters approach road at shastri park.
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreConstruction and maintenance of road and storm water drainage system etc at bodhjungnagar industrial estate tripura adb project package 02
Construction and maintenance of road and storm water drainage system etc at bodhjungnagar industrial estate tripura adb project package 02
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreSpecial repairs to building no p 229, p 230, p 231, p 237, p 238 and p 239 of type ii quarters in residential colony at nad under ge nd , visakhapatnam
Special repairs to building no p 229, p 230, p 231, p 237, p 238 and p 239 of type ii quarters in residential colony at nad under ge nd , visakhapatnam
Read moreRepair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar
Repair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar
Read moreRepair/ maintenance of pumping system, pipelines, control valves lt switchgear and allied works at jne, map accn, stps area, r centre, alpha mess pumphouse and other water supply installations under ge (u) udhampur
Repair/ maintenance of pumping system, pipelines, control valves lt switchgear and allied works at jne, map accn, stps area, r centre, alpha mess pumphouse and other water supply installations under ge (u) udhampur
Read moreSpecial repair to incoming ht cable and improvement to e/m installation and upgradation of existing transformer and allied works in sub station at subroto park under ge (af) subroto park, delhi cantt-10
Special repair to incoming ht cable and improvement to e/m installation and upgradation of existing transformer and allied works in sub station at subroto park under ge (af) subroto park, delhi cantt-10
Read moreConstruction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Read moreSurvey, investigation and execution for de-silting and associated works of existing storm water drainage pipeline in varanasi city, u.p. under deposit program (pkg-1)
Survey, investigation and execution for de-silting and associated works of existing storm water drainage pipeline in varanasi city, u.p. under deposit program (pkg-1)
Read moreof your Industry type