Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1000/Supply Of Boiler Super Heater Tubes
|
| Description |
Supply Of Boiler Super Heater Tubes
|
| Organisation | Kisan Sahkari Chini Mills Ltd. Sneh Road Nazibabad-Bijnor | State Govt. and UT |
| Tender Id | 2025_KSCS_1069010_1 |
|
Reference Number |
1000/SUPPLY OF BOILER SUPER HEATER TUBES |
| Tender Fee | 590 |
| EMD | 20000 |
| Tender Value | - |
| Place | KISAN SAHKARI CHINI MILLS LTD NAJIBABAD |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1950379 |
| Start Date | August 27, 2025 20:30 |
| End Date |
Expired
03/09/2025
Expired 405 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cogen boiler super heater zone insulation work
Cogen boiler super heater zone insulation work
Read moreSupply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Read moreBoiler#5 start up and super heater safety valve work
Boiler#5 start up and super heater safety valve work
Read moreSupply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Read moreBoiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreOt 14 removing and refixing the cassette baffle from low temperature super heater ltsh
Removing and refixing the cassette baffle from low temperature super heater ltsh upper bank coils and low temperature reheater ltrh lower bank coils shrouding plates from various places of boiler tubes such that hra fsh and frh
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Read moreTtps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Read moreTtps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027
Read moreof your Industry type