Tender Details

Particulars Details
Title
C.C. Lining In Main Canal Reach 2.693 Km. To 3.000 At Jagdishpur Pump Canal
Description
C.C. Lining In Main Canal Reach 2.693 Km. To 3.000 At Jagdishpur Pump Canal
Organisation U P Irrigation Department (Mechanical) | State Govt. and UT
Tender Id 2025_UPIDM_1074619_2
Reference
Number
03/E.E./2025-26(LOT-01)
Tender Fee 854
EMD 56000
Tender Value -
Place Executive Engineer Minor Lift Canal Division Jnp
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1962398

Start Date September 22, 2025 18:00
End Date
Expired 08/10/2025

Expired 354 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
C.c. lining in main canal reach 2.375 km to 2.685 km at jagdishpur pump canal

C.c. lining in main canal reach 2.375 km to 2.685 km at jagdishpur pump canal

Read more
C.c. lining in main canal reach 2.360 km to 2.725 km at mothaha pump canal

C.c. lining in main canal reach 2.360 km to 2.725 km at mothaha pump canal

Read more
C.c. lining in biwipur minor reach 0.600 km to 0.960 km at mothaha pump canal

C.c. lining in biwipur minor reach 0.600 km to 0.960 km at mothaha pump canal

Read more
Construction of c.c. lining work in chandarsi main canal from reach 1.800 km to 2.041 km district jalaun

Construction of c.c. lining work in chandarsi main canal from reach 1.800 km to 2.041 km district jalaun

Read more
Construction of stone lining in sirsa main canal reach from km 0.940 km to 1.140 km.

Construction of stone lining in sirsa main canal reach from km 0.940 km to 1.140 km.

Read more
Stone lining of badagaon main canal jhansi reach 3.00 km to 3.15 km of badagaon pump canal situated in block badagaon chirgaon district jhansi

Stone lining of badagaon main canal jhansi reach 3.00 km to 3.15 km of badagaon pump canal situated in block badagaon chirgaon district jhansi

Read more
Stone lining of badagaon main canal jhansi (reach 3.00 km to 3.15 km) of badagaon pump canal situated in block badagaon, chirgaon, district jhansi

Stone lining of badagaon main canal jhansi (reach 3.00 km to 3.15 km) of badagaon pump canal situated in block badagaon, chirgaon, district jhansi

Read more
Repairing of flag stone lining of badagaon main canal reach 0.50 km to 2nd vrb length 370 mtr at badagaon pump canal, jhansi

Repairing of flag stone lining of badagaon main canal reach 0.50 km to 2nd vrb length 370 mtr at badagaon pump canal, jhansi

Read more
Vertical stone lining in main canal of khuji pump canal from km. 0.200 to km. 0.350

Vertical stone lining in main canal of khuji pump canal from km. 0.200 to km. 0.350

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise