Tender Details
Particulars | Details |
---|---|
Title |
Arrangement Of Artificial Pond And Mandap On Rent For Immersion Of Ganpatil Idols At Kalina Tank Garden In H/East Ward For The Year 2024
|
Description |
Arrangement Of Artificial Pond And Mandap On Rent For Immersion Of Ganpatil Idols At Kalina Tank Garden In H/East Ward For The Year 2024
|
Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
Tender Id | 2024_MCGM_1076045_1 |
Reference Number |
DMC/Z-III/PR/277 |
Tender Fee | 500 |
EMD | 14700 |
Tender Value | |
Place | Santacruz (E) |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1877753 |
Start Date | August 26, 2024 22:15 |
End Date |
02/09/2024 ( Expired 263 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreDpr for construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (269.000) telibandha chowk (ch. 268.000) on raipur city portion of nh53 at raipur aurang section and ape(10.700) chowk of nh-30 raipur kodebad in chhattisgarh
Dpr for construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (269.000) telibandha chowk (ch. 268.000) on raipur city portion of nh53 at raipur aurang section and ape(10.700) chowk of nh-30 raipur kodebad in chhattisgarh
Read moreSitc of 10000 litres per hour capacity ro plant treated water output capacity 8000 litres per hour and allied equipments including operation and maintenance for 07 years on public private partnership ppp model at nsut east campus
Sitc of 10000 litres per hour capacity ro plant treated water output capacity 8000 litres per hour and allied equipments including operation and maintenance for 07 years on public private partnership ppp model at nsut east campus
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreRepair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).
Read moreConstruction of 01 nos surveillance cum op shelter acp shelter g 2 at bop bholaganj in aor of 110 bn bsf under shq bsf jowai sh pvdg iei fans and service connection and off grid solar plant
Construction of 01 nos surveillance cum op shelter acp shelter g 2 at bop bholaganj in aor of 110 bn bsf under shq bsf jowai sh pvdg iei fans and service connection and off grid solar plant
Read moreInviting rate for all kind of lt line extentin and shifting of lines transformers and other electrical work on mpuadd issr 02.08.2021 sor all item
Inviting rate for all kind of lt line extentin and shifting of lines transformers and other electrical work on mpuadd issr 02.08.2021 sor all item
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreConst. of separate bridge structure parallel to existing bridges for di of various diameters of water mains in h-k wards of western suburbs -separate bridge on vakola nalla near maharashtra nagar, valmiki nagar, bandra e in h east ward.
Const. of separate&#x0d bridge structure parallel to&#x0d existing bridges for di of various diameters of water mains in h-k wards of western suburbs -separate&#x0d bridge on vakola nalla near&#x0d maharashtra nagar, valmiki&#x0d nagar, bandra e in h&#x0d east ward.
Read moreConstruction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreof your Industry type