Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Measurement, Design, Fabrication, Supply, Fitting And Commissioning Of 96 Teeth Pinion Of 150 Hp Direct Haulage To Ensure Smooth Coal And Material Transportation At Pit No 2 Under Pandaveswar Colliery
|
| Description |
Measurement, Design, Fabrication, Supply, Fitting And Commissioning Of 96 Teeth Pinion Of 150 Hp Direct Haulage To Ensure Smooth Coal And Material Transportation At Pit No 2 Under Pandaveswar Colliery
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_348277_1 |
|
Reference Number |
GM-PND/EandM/25-26/190/1002 dated 27/11/2025 |
| Tender Fee | 0 |
| EMD | 10900 |
| Tender Value | |
| Place | Pandaveswar Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=360993 |
| Start Date | November 28, 2025 23:30 |
| End Date |
Expired
08/12/2025
Expired 181 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling, fitting and commissioning of 15l/10d direct haulage at no. 2 pit under pandaveswar colliery of pandaveswar area.
Dismantling, fitting and commissioning of 15l/10d direct haulage at no. 2 pit under pandaveswar colliery of pandaveswar area.
Read moreDismantling, foundation work and fitting of 2r/-1l pit bottom haulage for rectification of damaged bedframe structure and concrete foundation for smooth coal and material transportation at pit no. 2 under pandaveswar colliery, pandaveswar area
Dismantling, foundation work and fitting of 2r/-1l pit bottom haulage for rectification of damaged bedframe structure and concrete foundation for smooth coal and material transportation at pit no. 2 under pandaveswar colliery, pandaveswar area
Read moreDismantling, foundation work and fitting of 2r/-1l pit bottom haulage for rectification of damaged bedframe structure and concrete foundation for smooth coal and material transportation at pit no. 2 under pandaveswar colliery, pandaveswar area
Dismantling, foundation work and fitting of 2r/-1l pit bottom haulage for rectification of damaged bedframe structure and concrete foundation for smooth coal and material transportation at pit no. 2 under pandaveswar colliery, pandaveswar area
Read moreDismantling, loading on trolley, transportation from khottadih colliery to pandaveswar colliery and fitting of mamc make 90 hp direct haulage at pit no 2 for replacement of existing data make 15 no haulage at 14l/1d under pandaveswar colliery
Dismantling, loading on trolley, transportation from khottadih colliery to pandaveswar colliery and fitting of mamc make 90 hp direct haulage at pit no 2 for replacement of existing data make 15 no haulage at 14l/1d under pandaveswar colliery
Read moreDismantling, fitting and commissioning of -1north l/2 dip main pit bottom haulage at 2 no. pit under pandaveswar colliery.
Dismantling, fitting and commissioning of -1north l/2 dip main pit bottom haulage at 2 no. pit under pandaveswar colliery.
Read moreSupply and fitting of bm wild make gearbox pinion (direct haulage) of a pit of porascole east colliery
Supply and fitting of bm wild make gearbox pinion (direct haulage) of a pit of porascole east colliery
Read moreProposal for direct haulage installed at 1r/14l at no-2 pit,r-iv seam of pandaveswar colliery, pandaveswar area
Proposal for direct haulage installed at 1r/14l at no-2 pit,r-iv seam of pandaveswar colliery, pandaveswar area
Read moreFabrication work after lifting and transportation of 22mm haulage rope and 30 lbs rail for roof support related safety work at pit no 2 under pandaveswar colliery, pandaveswar area
Fabrication work after lifting and transportation of 22mm haulage rope and 30 lbs rail for roof support related safety work at pit no 2 under pandaveswar colliery, pandaveswar area
Read moreCommissioning of endless haulage at no. b pit (31l) and installation of voldrum haulage at 29l/2r at pandaveswar colliery
Commissioning of endless haulage at no. b pit (31l) and installation of voldrum haulage at 29l/2r at pandaveswar colliery
Read moreComplete repairing of k.e. make 90 hp, 3 phase, 550 volt slip ring motor at 15 no. direct haulage at pit no. 2 and prabhu make 150 hp, 550 v, 3 phase star-delta ers lying at fan house at pit no. b of pandaveswar colliery under pandaveswar area
Complete repairing of k.e. make 90 hp, 3 phase, 550 volt slip ring motor at 15 no. direct haulage at pit no. 2 and prabhu make 150 hp, 550 v, 3 phase star-delta ers lying at fan house at pit no. b of pandaveswar colliery under pandaveswar area
Read moreof your Industry type