Tender Details
Particulars | Details |
---|---|
Title |
Setting Up Of 17.5 Mw (Ac) Floating Solar Package At Gail Pata, Dist. Auraiya, Uttar Pradesh
|
Description |
Setting Up Of 17.5 Mw (Ac) Floating Solar Package At Gail Pata, Dist. Auraiya, Uttar Pradesh
|
Organisation | GAIL (India) Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 77.52 Lakh |
Tender Value | |
Place | PATA, U.P. |
Link |
AAAAAAAAAA Login to view |
Start Date | May 02, 2025 16:30 |
End Date |
20/05/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Eoi for qualifying requirements for single package epc for 3x125 mw tpp at gurha, bikaner dist.(raj)
Eoi for qualifying requirements for single package epc for 3x125 mw tpp at gurha, bikaner dist.(raj)
Read moreDesign, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Read moreAllotment of smp, kolkata land measuring about 10000 sq. mtrs at liquid cargo park, in the dock zone of hdc, smpa on lease of 30 years as is where is basis for setting up of industry / storage terminal / storage facilities for liquid bulk cargo
Allotment of smp, kolkata land measuring about 10000 sq. mtrs at liquid cargo park, in the dock zone of hdc, smpa on lease of 30 years as is where is basis for setting up of industry / storage terminal / storage facilities for liquid bulk cargo
Read moreAllotment of space at departure side of terminal building for setting up paid lounge at shirdi airport
Allotment of space at departure side of terminal building for setting up paid lounge at shirdi airport
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read morePackage-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Package-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreE-tender cum auction for setting up, operation and management of fast food units at b, d and e category of railway stations
E-tender cum auction for setting up, operation and management of fast food units at b, d and e category of railway stations
Read moreAllotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Read moreBos works for setting up of 810 mw (410mw & 400mw ) spp in rvunl park at rajasthan with o&m 3years
Bos works for setting up of 810 mw (410mw & 400mw ) spp in rvunl park at rajasthan with o&m 3years
Read moreof your Industry type