Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kumbharaj Provision Of First Foot Over Bridge.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77980255 |
|
Reference Number |
WCR-BPL-W-24-25-W-10-89 |
| Tender Fee | 0 |
| EMD | 2.39 Lakh |
| Tender Value | - |
| Place | Jabalpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/122024/77980255/viewNitPdf_4743968.pdf |
| Start Date | November 08, 2024 23:20 |
| End Date |
Expired
02/12/2024
Expired 685 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Provision of 6m wide foot over bridge with lifts at chandannagar station.
Provision of 6m wide foot over bridge with lifts at chandannagar station.
Read moreRepair of dawaran uri foot bridge over river jhelum
Repair of dawaran uri foot bridge over river jhelum
Read moreOhe work in connection with provision of new foot over bridge (fob) at adityapur station in ckp division.
Ohe work in connection with provision of new foot over bridge (fob) at adityapur station in ckp division.
Read moreConstruction of foot over bridge (fob) at digha railway station.
Construction of foot over bridge (fob) at digha railway station.
Read moreReplacement of connecting foot over bridge at mp-idsa, new delhi
Replacement of connecting foot over bridge at mp-idsa, new delhi
Read moreFixing of 40.00 mtr span steel foot bridge over giri river at dadahu distt.sirmour h.p
Fixing of 40.00 mtr span steel foot bridge over giri river at dadahu distt.sirmour h.p
Read moreConstruction of foot bridge over zamoo nallah bagori at lower mudhar block kastigarh (untied grant)
Construction of foot bridge over zamoo nallah bagori at lower mudhar block kastigarh (untied grant)
Read moreProviding structural and architectural consultancy for constt.of 40 mtr foot bridge over river sewa mohra gatt (bani)
Please refer in boq
Read moreOhe modification and other allied work in connection with capacity augmentation rom 200 locos to 250 locos at electric loco shed,6.10m foot over bridge at surat end and ahemdabad end, and foot over bridge with parcel lift at vadodara station.
Ohe modification and other allied work in connection with capacity augmentation rom 200 locos to 250 locos at electric loco shed,6.10m foot over bridge at surat end and ahemdabad end, and foot over bridge with parcel lift at vadodara station.
Read moreConstruction of foot over bridge for mumbai metro line 6 vikhroli metro station part a and jogeshwari metro station part b
Construction of foot over bridge for mumbai metro line 6 vikhroli metro station part a and jogeshwari metro station part b
Read moreof your Industry type