Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rubber Lining Of Aru Vessel Of Cpu Regeneration Stage I Ntpc Mouda
|
| Description |
Rubber Lining Of Aru Vessel Of Cpu Regeneration Stage I Ntpc Mouda
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2025_NTPC_97998_1 |
|
Reference Number |
NTPC/Mouda STPP/9900305721 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Mouda Super Thermal Power Mouda -Ramtek Road ,Moud |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=101196 |
| Start Date | June 21, 2025 15:30 |
| End Date |
Expired
30/06/2025
Expired 468 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ktps-vii stage-tm- procurement of pneumatic actuator for cpu regeneration system
Tggenco-ktps-vii stage-tm- procurement of pneumatic actuator for cpu regeneration system
Read moreProcurement of power supply modules for id fan vfd system at ntpc mouda
Procurement of power supply modules for id fan vfd system at ntpc mouda
Read moreProcurement of stage 4 silo unloading spout-ntpc unchahar
Procurement of stage 4 silo unloading spout-ntpc unchahar
Read moreTggenco-ytps(5x800mw)-cam-iv-bop-supply of bdk make body diaphragms for diaphragm valves and body seats for butterfly valves in cpu regeneration area in dm plant
Tggenco-ytps(5x800mw)-cam-iv-bop-supply of bdk make body diaphragms for diaphragm valves and body seats for butterfly valves in cpu regeneration area in dm plant
Read moreDifferent sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Different sizes of rubber expansion joints (bellows) in water system of cam division of ktps-vi stage
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreS-cpg3-5445-rubber lining of aru,cru and iru of cpu regeneration stage-i ntpc barh
S-cpg3-5445-rubber lining of aru,cru and iru of cpu regeneration stage-i ntpc barh
Read moreSupply, erection and commissioning of mixed resin storage vessel(mrsv) in cpu regeneration plant, stage ii, khstpp
Supply, erection and commissioning of mixed resin storage vessel(mrsv) in cpu regeneration plant, stage ii, khstpp
Read moreRotex solenoids valves for stage 1 2 compressor cpu cpu regeneration
Rotex solenoids valves for stage 1 2 compressor cpu cpu regenerationsystem ash handling system.
Read moreSupply, erection and commissioning of mixed resin storage vessel (mrsv) in cpu regeneration at ntpc talcher stage-2
Supply, erection and commissioning of mixed resin storage vessel (mrsv) in cpu regeneration at ntpc talcher stage-2
Read moreof your Industry type