Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling And Lifting Of Sdl No 1782 From Ug Of Millennium Incline Of Shankarpur Colliery And Transportation And Fitting Of Same Machine At No 1 Incline Of Bankola Colliery
|
Description |
Dismantling And Lifting Of Sdl No 1782 From Ug Of Millennium Incline Of Shankarpur Colliery And Transportation And Fitting Of Same Machine At No 1 Incline Of Bankola Colliery
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_298770_1 |
Reference Number |
ECL/GM/BA/E TENDER/23-24/EnM/250 Dt. 15.01.2024 |
Tender Fee | 0 |
EMD | 2000 |
Tender Value | |
Place | Bankola Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309476 |
Start Date | January 16, 2024 23:30 |
End Date |
27/01/2024 ( Expired 514 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of cc road and drain from samay gest house to purana galla mandi road and khilona machine to haweli ke piche thagan wali gali at ward no 09 tikamgarh
Construction of cc road and drain from samay gest house to purana galla mandi road and khilona machine to haweli ke piche thagan wali gali at ward no 09 tikamgarh
Read moreConstruction of 33kv line from no 11 tarajan rob to jonai dss
Construction of 33kv line from no 11 tarajan rob to jonai dss apdcl via lakhi napali village under jonai esd 4.5 ckm along with construction of 33kv terminal bay at jonai dss of apdcl and construction of 33kv ug highway crossing at no 2 torajan
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read morePr11923/155/1- restoration of 03 no. 11 kv line from 33/11 kv substation, behali to power house and sapangini township at parbati-iii power station
Restoration of 03 no. 11 kv line from 33/11 kv substation, behali to power house and sapangini township at parbati-iii power station
Read moreLaying of pipe line from water supply and execution of other work in different location at site ward no. 49 near samadhiya colony hanuman bandh road etc. file no. 194/25x9/1
Laying of pipe line from water supply and execution of other work in different location at site ward no. 49 near samadhiya colony hanuman bandh road etc. file no. 194/25x9/1
Read moreLaying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Read moreProvision towards laying of 250mm dia di k-9 w/s rising main with connection to 900mm dia di feeder mains from sikharchandi with fixing of flow meter and flow control valves etc for loading of gsr at ss vihar phase-6 part-2 in ward no-1 of bmc, bbsr
Provision towards laying of 250mm dia di k-9 w/s rising main with connection to 900mm dia di feeder mains from sikharchandi with fixing of flow meter and flow control valves etc for loading of gsr at ss vihar phase-6 part-2 in ward no-1 of bmc, bbsr
Read moreRepair / maint of transformers, ht ug cables and allied work at various locations under ge (af) jamnagar no 1.
Repair / maint of transformers, ht ug cables and allied work at various locations under ge (af) jamnagar no 1.
Read moreConstruction of 40 nos. of ventilation stoppings by brickwork at propose section-i dist. 134nl, 130nl, 134sl dist. h.r. section-i and main dip of orient colliery mine no. 1 and 2, osa, oa, mcl.
Construction of 40 nos. of ventilation stoppings by brickwork at propose section-i dist. 134nl, 130nl, 134sl dist. h.r. section-i and main dip of orient colliery mine no. 1 and 2, osa, oa, mcl.
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreof your Industry type