Tender Details
Particulars | Details |
---|---|
Title |
Custom Bid For Services Round The Clock Operation Of Submersible Pump Pumphouse Ro Plants And Etp
|
Description |
|
Organisation | Indian Railways | Ministry of Railways |
Tender Id | GEM/2023/B/3716103 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://gem.gov.in/ |
Start Date | July 21, 2023 19:33 |
End Date |
05/08/2023 ( Expired 672 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S.No. | Seller Name | Participated On | EMD Status | MSE/MII Status | Status |
---|---|---|---|---|---|
1 | ENVIRO WAY BIO-SCIENCE PRIVATE LIMITED | 05-08-2023 12:57:43 | Registered with designated Agency / Authority | MSE | Qualified |
2 | GISCON ENGINEERING SERVICES PRIVATE LIMITED | 04-08-2023 17:35:49 | MSE | MSE | Disqualified |
3 | NEXT STEP LIGHTS INDIA PRIVATE LIMITED | 04-08-2023 13:16:09 | Start-up | MSE | Disqualified |
4 | om prakash gangwal | 26-07-2023 12:32:23 | MSE | MSE | Qualified |
S.No. | Seller Name | Offered Item | Total Price | Rank |
---|---|---|---|---|
1 | om prakash gangwal( MSE Social Category:General ) | Item Categories : Custom Bid for Services - Round the clock operation of submersible pump pumphouse RO Plants and ETP | 2418648.00 | L1 |
2 | ENVIRO WAY BIO-SCIENCE PRIVATE LIMITED | Item Categories : Custom Bid for Services - Round the clock operation of submersible pump pumphouse RO Plants and ETP | 2512827.90 | L2 |
Contract Details
- Contract Status:
- Order Accepted
- Seller:
- om prakash gangwal
- Buyer Designation:
- Asst Manager Civil
- Buying Mode:
- Bid/RA
- Contract Date:
- 2023-08-17 23:40:00 +0530
- Contract Amount:
- 2418648
Service | Category Name | Ordered Quantity | Price |
---|---|---|---|
Custom Bid for Services - Round the clock operation of submersible pump pumphouse RO Plants and ETP plants at ICDTKD | Custom Bid for Services | 1 | ₹ 2418648.000 |
Appointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreEngaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Engaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Read moreConsultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Consultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreRfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic&#x0d compatibility (emc) testing facility in&#x0d sipcot medical devices park at oragadam, kancheepuram dist. for a period of 10 years&#x0d
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreof your Industry type