Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Illumination By Installing Solar Lighting At Median Opening Locations Of Mo Rth Identified Blackspots And The Police Identified Accident Spots Of Hyderabad Vijayawada Section Of Nh 65 (Old Nh 9) From Km.40.000 To Km.221.500 In The States Of
|
| Description |
Providing Illumination By Installing Solar Lighting At Median Opening Locations Of Mo Rth Identified Blackspots And The Police Identified Accident Spots Of Hyderabad Vijayawada Section Of Nh 65 (Old Nh 9) From Km.40.000 To Km.221.500 In The States Of
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_212427_1 |
|
Reference Number |
NHAI/PIU-HYD/Road Safety/2024/ |
| Tender Fee | 25000 |
| EMD | 3.89 Lakh |
| Tender Value | - |
| Place | Hyderabad-Vijayawada section of NH-65 |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=233653 |
| Start Date | October 24, 2024 21:40 |
| End Date |
Expired
20/11/2024
Expired 692 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sr (special repair) work of permanent rectification of blackspots including street lights on nh-52/11
Sr (special repair) work of permanent rectification of blackspots including street lights on nh-52/11
Read moreRectification of 2 nos.of blackspots at akkammagarla temple crossing road ap (03) 248 and kld circle road ap (04) 200 on nh 544dd in the state of andhra pradesh
Rectification of 2 nos.of blackspots at akkammagarla temple crossing road ap (03) 248 and kld circle road ap (04) 200 on nh 544dd in the state of andhra pradesh
Read moreImprovement of junction, installation of street light/high mast light, construction of road side drainage etc. on accident prone locations of nh-162e km 0/000 to 88/800
Improvement of junction, installation of street light/high mast light, construction of road side drainage etc. on accident prone locations of nh-162e km 0/000 to 88/800
Read moreSpecial repair work construction of rcc crash barrier at urban stretch in median from ch. 308.359 to 315.500 of ch. jodhpur-pali road on section of nh-62 in dbfot stretch
Special repair work construction of rcc crash barrier at urban stretch in median from ch. 308.359 to 315.500 of ch. jodhpur-pali road on section of nh-62 in dbfot stretch
Read moreConstruction of railing (both side) on median and road safety works from km 256.550 to km 299 (site km 263.160 to km 306.700) on nh 52 in the state of rajasthan
Construction of railing (both side) on median and road safety works from km 256.550 to km 299 (site km 263.160 to km 306.700) on nh 52 in the state of rajasthan
Read moreConstruction of iconic hybrid cable stayed and suspension bridge across krishna river on nh -167k (design chainage km 87.360 to km 88.437) in the states of telangana and andhra pradesh on engineering, procurement and construction (epc) basis
Construction of iconic hybrid cable stayed and suspension bridge across krishna river on nh -167k (design chainage km 87.360 to km 88.437) in the states of telangana and andhra pradesh on engineering, procurement and construction (epc) basis
Read moreLong term rectification of the morth identified 03 nos of blackspots at ashrafpur and jiyanpur and at latghat on nh 128c in the state of uttar pradesh
Long term rectification of the morth identified 03 nos of blackspots at ashrafpur and jiyanpur and at latghat on nh 128c in the state of uttar pradesh
Read moreImprovement of morth identified blackspots through construction of grade separators at selected locations along nh 75 corridor bw km.216.91 to km.302.42 with an effective improvement length 25.6 km under nh(o) on epc mode in the state of karnataka
Improvement of morth identified blackspots through construction of grade separators at selected locations along nh 75 corridor bw km.216.91 to km.302.42 with an effective improvement length 25.6 km under nh(o) on epc mode in the state of karnataka
Read moreConstruction of 4 no underpasses comprising 2 no vups and 2 lvups at identified blackspot/ accident prone locations of angul sambalpur of nh 55 in the state of odisha
Construction of 4 no underpasses comprising 2 no vups and 2 lvups at identified blackspot/ accident prone locations of angul sambalpur of nh 55 in the state of odisha
Read moreSix-laning of hyderabad-vijayawada section of nh-65 section ch.39.85 to ch.221.15 (181.30 km) (pkg-1) in the states of telangana and andhra pradesh under bot mode
Six-laning of hyderabad-vijayawada section of nh-65 section ch.39.85 to ch.221.15 (181.30 km) (pkg-1) in the states of telangana and andhra pradesh under bot mode
Read moreof your Industry type