Tender Details

Particulars Details
Title
Customized Camc Of Kone Make 45 Escalators Installed Over 06 Ug Stations Of Line 2 Phase I For 3 Years.
Description
Customized Camc Of Kone Make 45 Escalators Installed Over 06 Ug Stations Of Line 2 Phase I For 3 Years.
Organisation Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department
Tender Id 2024_DMRC_841476_1
Reference
Number
OEM-1804
Tender Fee 23600
EMD 2.17 Lakh
Tender Value
Place New Delhi
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=884539
Start Date January 20, 2025 14:30
End Date

27/01/2025 ( Expired 152 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Special repairs for conversion of lt over head line into lt ug cable and connected misc work at vsv area afs bidar

Special repairs for conversion of lt over head line into lt ug cable and connected misc work at vsv area afs bidar

Read more
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.

Read more
E tender for dismantling, design, manufacture, sitc and handing over of 1 no. 26 persons capacity bed-cum passenger lift at main hospital with 3 years camc after one year guarantee period in chpa

E tender for dismantling, design, manufacture, sitc and handing over of 1 no. 26 persons capacity bed-cum passenger lift at main hospital with 3 years camc after one year guarantee period in chpa

Read more
Replacement of cooling towers installed at various underground metro stations of line 2 and 3 in dmrc network.

Replacement of cooling towers installed at various underground metro stations of line 2 and 3 in dmrc network.

Read more
Hiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.

Hiring the services of a brand new bolero camper di,4wd with double cabin base model or an equivalent model vehicle with standard fittings including 1 no. driver and 2 nos. helpers for providing pigging assistance services e.g. cleaning, handling and transportation of crude oil or wax or sludge or pig in duliajan digboi cod line for a periof of 4 years.

Read more
Annual repairs and maintenance of sewer line network (for 2 years) by mechanical means in sector - r3, r4, r5 at r and r pocket no.1, sector - r1, r2 at r and r pocket no.2 and sector - 1 at r and r pocket no.3 of pushpak node, navi mumbai.

Annual repairs and maintenance of sewer line network (for 2 years) by mechanical means in sector - r3, r4, r5 at r,r pocket no.1, sector - r1,r2 at r and r pocket no.2&amp#x0d and sector - 1 at r and r pocket no.3 of pushpak node, navi&amp#x0d mumbai.

Read more
Maintenance contract for controlling leakage and seepage in elevated section/viaduct, station building, ancillary building, depot, rss and maintenance of drainage system of viaduct of line - 7 from mayur vihar phase-i (including) to shiv vihar...

Maintenance contract for controlling leakage and seepage in elevated section/viaduct, station building, ancillary building, depot, rss and maintenance of drainage system of viaduct of line - 7 from mayur vihar phase-i (including) to shiv vihar...

Read more
Ca no.cwe bly/ge (w)/39 of 2025- 2026conversion of over head line into ug cable and allied external electric work at kv no. 2 jla under ge (west) bareilly

Ca no.cwe bly/ge (w)/39 of 2025- 2026conversion of over head line into ug cable and allied external electric work at kv no. 2 jla under ge (west) bareilly

Read more
Pre and post monsoon deep cleaning work at viaduct of metro line 2a, line 7 and charkop depot line for the period of 3 years.

Pre and post monsoon deep cleaning work at viaduct of metro line 2a, line 7 and charkop depot line for the period of 3 years.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise