Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Lt/C132 000 Jx Mr 6810/01 Desalter Package For Epcm, Supply And Associated Services For Phase 2 Revamp Of 2 Stage Desalter System In Cdu 3 In Bpcl Kochi Refinery (Bpcl)
|
Description |
Desalter Package For Epcm, Supply And Associated Services For Phase 2 Revamp Of 2 Stage Desalter System In Cdu 3 In Bpcl Kochi Refinery (Bpcl)
|
Organisation | Engineers India Limited,MoPNG | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | REFER BIDDING DOCUMENT |
Link |
AAAAAAAAAA Login to view |
Start Date | July 14, 2025 17:30 |
End Date |
21/07/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Lt/c132-000-jx-mr-6810/01 - desalter package for epcm, supply and associated services for phase -2 revamp of 2 stage desalter system in cdu 3 in bpcl kochi refinery (bpcl)
Desalter package for epcm, supply and associated services for phase -2 revamp of 2 stage desalter system in cdu 3 in bpcl kochi refinery (bpcl)
Read moreImprovement/augmentation of lt distribution system at cgae nedumbassery and provision of standby power supply cabling for cgae kochi and provision 3 phase supply for electric cooking range at ships galley and officers mess kitchen.
Improvement/augmentation of lt distribution system
 at cgae nedumbassery and provision of standby power
 supply cabling for cgae kochi and provision 3 phase
 supply for electric cooking range at ships galley and
 officers mess kitchen.
Read moreExpression of interest for design, engineering, supply, installation and commissioning of automatic lpg cylinder loading/unloading system to/from packed trucks in lpg bottling plant at bpcl mumbai refinery.
Expression of interest for design, engineering, supply, installation and commissioning of automatic lpg cylinder loading/unloading system to/from packed trucks in lpg bottling plant at bpcl mumbai refinery.
Read moreSupply and supervision for lnst comm of advance machine diagnostics system in gt-2 3 at mathura refinery-rmrm250008
Supply and supervision for lnst comm of advance machine diagnostics system in gt-2 3 at mathura refinery-rmrm250008
Read moreReplacement of old 20 sqmm acsr with 30 sqmm pvc insulated acsr of street light phase in existing lt lines and providing 2 nos.street light pedestals in sector-33 at hisar. including 3 years defect liability period for all other items free of cost.
Replacement of old 20 sqmm acsr with 30 sqmm pvc insulated acsr of street light phase in existing lt lines and providing 2 nos.street light pedestals in sector-33 at hisar. including 3 years defect liability period for all other items free of cost.
Read moreSupply and delivery of 1800 nos rachyem indo macedon sintex equivalent make lt distribution junction box along with pole mounting clamps for service line 3 phase 4 wire connection in ab cable system to wbsedcls malda gazole and chanchal store
Supply and delivery of 1800 nos rachyem indo macedon sintex equivalent make lt distribution junction box along with pole mounting clamps for service line 3 phase 4 wire connection in ab cable system to wbsedcls malda gazole and chanchal store
Read moreSupply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Supply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Read moreSupply, installation and commissioning of 2 x 60 kva three phase solid state, on-line, ups system along with five years of amc for sldc, mpptcl jabalpur.
Supply, installation and commissioning of 2 x 60 kva three phase solid state, on-line, ups system with associated equipments,mandatory spares along with five years of amc for sldc, mpptcl jabalpur.
Read moreSupply of skilled electrician and semi skilled electrician for maintenance of electrical services in puda office complex urban estate phase-2 at patiala
Supply of skilled electrician and semi skilled electrician for maintenance of electrical services in puda office complex urban estate phase-2 at patiala
Read more(1) supply of smart rtu prototype systems for phase-i, qty: 3 no s and (2) supply of smart rtu production systems for phase-ii, qty: 3 no s. scope of work & technical details as mentioned in annexure t1 to ecil-hyderabad.
(1) supply of smart rtu prototype systems for phase-i, qty: 3 no s and (2) supply of smart rtu production systems for phase-ii, qty: 3 no s. scope of work & technical details as mentioned in annexure t1 to ecil-hyderabad.
Read moreof your Industry type