Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🔋 Power Grid Corporation Of India Limited (Mnre) Is Seeking Bids For Manpower Assistance In The Maintenance Of High Voltage Electrical Infrastructure. 🛠️ The Scope Includes Substation And Transmission Line Works At 400/220 K V Gorakhpur Substation (Ss), Gorakhpur Transmission Line Maintenance (Tlm), And The 800 K V Bnc Agra Hvdc Line Repeater Station In Deoria. 📆 Bid Submission Deadline: May 16, 2024, 11:00 Am A Tender Fee Of Inr 203,000 Must Be Submitted As An Earnest Money Deposit (Emd) With The Bid. Interested Bidders Should Possess The Necessary Expertise And Resources To Provide Manpower Assistance For A Period Of Two Years. Proposals Must Be Submitted Through The Government E Marketplace (Ge M) And Adhere To The Specifications And Guidelines Provided In The Tender Document. Keywords: Manpower Assistance, Maintenance, Substation, Transmission Line, High Voltage, Power Grid Corporation Of India Limited, Ge M, Electrical Infrastructure, Hvdc Line, Bnc Agra, Gorakhpur, Central Govt. Ministry/DepartmentParticulars | Details |
---|---|
Title |
Providing Manpower Assistance Inmaintenance Of Substation And Transmission Line Works At 400/220 K V Gorakhpur Ss, Gorakhpur Tlm And 800 Kv Bnc Agra Hvdc Line Repeater Station, Deoria For A Period Of 02 Years Through Ge M
|
Description |
Providing Manpower Assistance Inmaintenance Of Substation And Transmission Line Works At 400/220 K V Gorakhpur Ss, Gorakhpur Tlm And 800 Kv Bnc Agra Hvdc Line Repeater Station, Deoria For A Period Of 02 Years Through Ge M
|
Organisation | Power Grid Corporation of India Limited | Central Govt. Ministry/Department |
Tender Id | 24065 |
Reference Number |
NR3/NT/S-AMC/DOM/K00/24/06194 |
Tender Fee | 0 |
EMD | 2.03 Lakh |
Tender Value | |
Place | GORAKHPUR |
Link | https://apps.powergrid.in/pgciltenders/u/view-published-tender-details.aspx?tid=714112aa-2409-4eb1-9463-fbfd330e5869 |
Start Date | May 06, 2024 23:54 |
End Date |
16/05/2024 ( Expired 417 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Substation package: ss-02 (i) 02 nos. of 400 kv line bays at 765/400/220 kv bikaner-iii ps for interconnection of 1400mw rppd of m/s sunbreeze renewables nine pvt. ltd. (sr9pl) (2 nos. bays).
765/400/220 kv ais extension package - substation package: ss-02 (i) 02 nos. of 400 kv line bays at 765/400/220 kv bikaner-iii ps for interconnection of 1400mw rppd of m/s sunbreeze renewables nine pvt. ltd. (sr9pl) (2 nos. bays).
Read moreSubstation package ss-01 (i) 1 no. 220kv line bay at bikaner-iii ps for interconnection of 300mw regs of m-s deshraj solar energy pvt. ltd. (dsepl). (ii) 1 no. of 400 kv line bay at 765/400/220 kv bikaner-iii ps for interconnection of 1000mw rppd of m-s mrs buildvision pvt. ltd. (mbpl) and 400 kv bus extension work
765/400/220 kv ais extension package - substation package ss-01 (i) 1 no. 220kv line bay at bikaner-iii ps for interconnection of 300mw regs of m-s deshraj solar energy pvt. ltd. (dsepl). (ii) 1 no. of 400 kv line bay at 765/400/220 kv bikaner-iii ps for interconnection of 1000mw rppd of m-s mrs buildvision pvt. ltd. (mbpl) and 400 kv bus extension work
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read more765kv ais new substation package ss 120t for establishment of 765/400 kv cn halli station associated with transmission system for integration of ananthapuram-ii rez - phase-ii (3 gw) through tbcb route
765kv ais new substation package ss 120t for establishment of 765/400 kv cn halli station associated with transmission system for integration of ananthapuram-ii rez - phase-ii (3 gw) through tbcb route
Read more765kv ais new substation package ss 118t for a) establishment of 765-400 kv shadnagar station b) extension of 400kv shadnagar (tgtransco) c) extension of 400kv kethiredipally (tgtransco) associated with transmission system for kurnool-iv rez - phase-ii (3 gw) through tbcb route
765kv ais new substation package ss 118t for a) establishment of 765/400 kv shadnagar station b) extension of 400kv shadnagar (tgtransco) c) extension of 400kv kethiredipally (tgtransco) associated with transmission system for kurnool-iv rez - phase-ii (3 gw) through tbcb route
Read moreDeployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years
Deployment of 01 no. brand new utility vehicle (bolero camper gold zx ) at 400 kv rajarhat gis substation for transmission line maintenance work for a period of 03 years
Read moreLilo of 400 kv puhana pgcil muzafarnagar line at proposed 400 220 kv gis substation roorkee through overhead line and underground cable
Lilo of 400 kv puhana pgcil muzafarnagar line at proposed 400 220 kv gis substation roorkee through overhead line and underground cable
Read moreOutsourcing of routine operation of 220/132kv pithoragarh sub-station with skilled manpower (engineer) for a period of 03 years (36 months) through gem
Outsourcing of routine operation of 220/132kv pithoragarh sub-station with skilled manpower (engineer) for a period of 03 years (36 months) through gem
Read moreHiring of five (05) nos manpower (highly skilled) for attending defects transmission lines during di works defect rectification during summer season and insulator cleaning in winter season at chhatarpur tlm for 2 years through gem
Hiring of five (05) nos manpower (highly skilled) for attending defects transmission lines during di works defect rectification during summer season and insulator cleaning in winter season at chhatarpur tlm for 2 years through gem
Read moreFor operation and maintenance work of 33/11 kv substation pathribagh and its associated line (33 kv, 11 kv, 0.4 kv, dtr) and redressal of consumer complaint under edd (south), dehradun through outer agency for the period of 02 years.
For operation and maintenance work of 33/11 kv substation pathribagh and its associated line (33 kv, 11 kv, 0.4 kv, dtr) and redressal of consumer complaint under edd (south), dehradun through outer agency for the period of 02 years.
Read moreof your Industry type