Tender Details

Particulars Details
Title
Wbmad/Ulb/Rsm/287/23 24
Description
Construction Of Concrete Road From Basundhara Appartment To Ashim Roys House Under Ward No.30 Of Rajpur Sonarpur Municipality.
Organisation Government of West Bengal
Tender Id 2023_MAD_581432_1
Reference
Number
WBMAD/ULB/RSM/287/23-24
Tender Fee 0
EMD 4873
Tender Value
Place RAJPUR SONARPUR MUNICIPALITY
Link https://wbtenders.gov.in
Start Date October 03, 2023 16:30
End Date

10/10/2023 ( Expired 583 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
It addl. pune infotech park i industrial

Construction of 6 lane road using cement&amp#x0d concrete treatment with footpath and storm water pipeline&amp#x0d repairing and providing new curbing at center verge and&amp#x0d road furnitures from shivaji chowk to smashan bhumi&amp#x0d

Read more
Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency

Construction of flood protection wall from rafeal cardoz house to salvador fernandes house at zorichembhat in ward no.7 of v.p. carambolim in cumbharjua constituency

Read more
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Read more
Construction of cc drain ward no. 13 from raghuraj school to house of dharmdas shahdol as per nit and estimate.

Construction of cc drain ward no. 13 from raghuraj school to house of dharmdas shahdol as per nit and estimate.

Read more
Construction of cc drain ward no. 20 near house of basant soni shahdol as per nit and estimate.

Construction of cc drain ward no. 20 near house of basant soni shahdol as per nit and estimate.

Read more
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise