Tender Details

Particulars Details
Title
New Electrification Work At The Proposed Hall On The Second Floor Over The Existing Ground Floor And First Floor At Kharagpur College Kharagpur,Paschim Medinipur, Westbengal .
Description
New Electrification Work At The Proposed Hall On The Second Floor Over The Existing Ground Floor And First Floor At Kharagpur College Kharagpur,Paschim Medinipur, Westbengal .
Organisation DEPARTMENT OF HIGHER EDUCATION | State Govt. and UT
Tender Id 2023_DHE_609557_1
Reference
Number
KC/03/2023-24
Tender Fee 500
EMD 2500
Tender Value
Place KHARAGPUR COLLEGE
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1293243
Start Date January 05, 2024 15:30
End Date

20/01/2024 ( Expired 534 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of meeting hall in first floor over the existing ground floor of barnoporichoi museum at the premises of paschim medinipu zilla parisad. (5th sfc)

Construction&amp#x0d of meeting&amp#x0d hall in first&amp#x0d floor over&amp#x0d the existing&amp#x0d ground floor&amp#x0d of&amp#x0d barnoporichoi&amp#x0d museum at the&amp#x0d premises of&amp#x0d paschim&amp#x0d medinipu zilla&amp#x0d parisad. (5th&amp#x0d sfc)

Read more
Underground scanning and survey at fact udyogamandal complex for locate existing under ground utilities of proposed locations of new ammonia handling control room, air drying tower and ud store.

Underground scanning and survey at fact udyogamandal complex for locate existing under ground utilities of proposed locations of new ammonia handling control room, air drying tower and ud store.

Read more
Electrification work in connection with construction of training hall with hollow section truss and false ceiling above second floor level of the office building of dda admn nadia krishnagar nadia

Electrification work in connection with construction of training hall with hollow section truss and false ceiling above second floor level of the office building of dda admn nadia krishnagar nadia

Read more
Construction of new roof after dismantling existing roof first floor roof at superintending engineer office tubewell investigation and planning circle lucknow

Construction of new roof after dismantling existing roof first floor roof at superitending engineer office tubewell investing and planning circle lucknow

Read more
Construction work at second floor for new class room within school campus at garh haripur g.n.high school(h.s).

Construction work at second floor for new class room within school campus at garh haripur g.n.high school(h.s). vill-puyan,p.o.-garh haripur, p.s.-belda dist.-paschim medinipur

Read more
Proposed construction of additional third floor and renovation of existing basement, ground, first, second floor in sriramanuja jeeyar mutt belongs to arulmigu aranganatha swamy temple, srirangam at tirumala, tirupati.

Proposed construction of additional third floor and renovation of existing basement, ground, first, second floor in sriramanuja jeeyar mutt belongs to arulmigu aranganatha swamy temple, srirangam at tirumala, tirupati.

Read more
Infrastructure development of ghanakanta baruah college, (construction of rcc second floor over existing g plus 1 administrative building and horizonal extension (rcc g plus 2) of existing ground floor library building) at morigaon district

Infrastructure development of ghanakanta baruah college, (construction of rcc second floor over existing g plus 1 administrative building and horizonal extension (rcc g plus 2) of existing ground floor library building) at morigaon district

Read more
Construction of g plus 2 building on first and second floor above bhojshala bhawan (prasadalaya) at omkareshwar district khandwa mp

Construction of g plus 2 building on first and second floor above bhojshala bhawan (prasadalaya) at omkareshwar district khandwa mp

Read more
Renovation of toilets at ground floor, first floor of new building and ground floor, first floor and second floor of old building of palika bhawan.

Renovation of toilets at ground floor, first floor of new building and ground floor, first floor and second floor of old building of palika bhawan.

Read more
Sitc of ups system

Electrical installation work for setting up new blood component separation and blood storage unit beside blood bank at ground floor of ipd building at m r bangur hospital , south 24 pgs._sitc of ups system

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise