Tender Details
About Tender
🏭 Urgent: Protection Work Bid For Uri Ii Power Station 💧 Nhpc Limited, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids From Experienced Contractors For Providing Protection Work Near The Power Intake Of The Uri Ii Power Station, Jammu & Kashmir. 📅 Bid Submission Deadline: May 30, 2024, 5:00 Pm Tender Fee: Inr 590 Emd: Inr 56000 This Project Involves Critical Infrastructure Protection And Requires A Contractor With A Proven Track Record In Similar High Risk Environments. Interested Parties Should Submit Detailed Bids, Including Method Statements, Safety Plans, And Financial Proposals, By The Specified Deadline. Keywords: Protection Work, Uri Ii Power Station, Nhpc Limited, Central Govt., Infrastructure, Jammu & Kashmir, Tender, Bid Submission, Emd, Tender FeeParticulars | Details |
---|---|
Title |
Providing Protection Work Near Power Intake Of Uri Ii Power Station, Jk
|
Description |
Providing Protection Work Near Power Intake Of Uri Ii Power Station, Jk
|
Organisation | NHPC Limited | Central Govt. Ministry/Department |
Tender Id | 2024_NHPC_806710_1 |
Reference Number |
NH/Uri-II/CnP/24-25/113 |
Tender Fee | 590 |
EMD | 56000 |
Tender Value | |
Place | Uri2 Power Station,Nowpora,uri,Baramulla |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=847878 |
Start Date | May 10, 2024 15:30 |
End Date |
30/05/2024 ( Expired 352 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreElectrification work of shifting of transformer in roshan nagar near shambul kirana shop, shri ramjanki hanuman ward no. 18
Electrification work of shifting of transformer in roshan nagar near shambul kirana shop, shri ramjanki hanuman ward no. 18
Read moreConstruction work of cc road at five places, boundary wall and retaining wall including gate near mangal bhawan and paver block work in the courtyard of ambedkar mangal bhawan etc. in bhagwanganj ward, sagar-parshad nidhi
Construction work of cc road at five places, boundary wall and retaining wall including gate near mangal bhawan and paver block work in the courtyard of ambedkar mangal bhawan etc. in bhagwanganj ward, sagar-parshad nidhi
Read moreWard no 03 construction work of proposed hall shop block a and b on the first floor of the shopping complex built under idsmt scheme near shiv mandir
Ward no 03 construction work of proposed hall shop block a and b on the first floor of the shopping complex built under idsmt scheme near shiv mandir
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreR and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
R and r of bituminous concrete 30 mm on road from approach road to check post no. 2 , from check post no. 1 to circle office and other patch work at shanan power house , joginder nagar distt mandi (hp)
Read moreMtc of type ii iii and iv qtr total 24 nos under kumarghat sub divisional hospital during the year 2024 25 sh r c c work finishing work water supply and sanitary line etc
Mtc of type ii iii and iv qtr total 24 nos under kumarghat sub divisional hospital during the year 2024 25 sh r c c work finishing work water supply and sanitary line etc
Read moreof your Industry type