Tender Details
Particulars | Details |
---|---|
Title |
Widening And Strengthening Of Double Lane Carriageway To Four Lane From Km 0/0 To 7/0 ( Work In Km 0/0 To 2/6 And 5/3 To 7/0 ) Of Old Sna Road I.E., From Sangupet Vup At Nh 161 To Annasagar In Jogipet Municipality Limits In Sangareddy District. Sub Work: Providing Central Lighting
|
Description |
Widening And Strengthening Of Double Lane Carriageway To Four Lane From Km 0/0 To 7/0 ( Work In Km 0/0 To 2/6 And 5/3 To 7/0 ) Of Old Sna Road I.E., From Sangupet Vup At Nh 161 To Annasagar In Jogipet Municipality Limits In Sangareddy District. Sub Work: Providing Central Lighting
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 580758 |
Reference Number |
NIT No. 44 / SE / RB / elec / Hyd / 2024-2025 Dt. 10..03.2025 |
Tender Fee | 4383 |
EMD | 1.24 Lakh |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | March 12, 2025 06:00 |
End Date |
26/03/2025 ( Expired 26 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreAAAAAAAAAA
Login to viewBalance work of widening improvement to 2 lane lane with paved shoulder from km 27.150 to km 47.682 on dibrugarh to ledo section with proposed margherita and ledo bypass of nh 38 in tinsukia
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read moreUpgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)
Read moreUpgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreWidening to 4 lane of nh-20 (old nh-75e) from km 16.400 to km 47.700 (tupudana to kundibartoli) in the state of jharkhand (total length 31.300 km) on hybrid annuity mode.
Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 (design chainage) to km
 47.700 (design chainage(tupudana to
 kundibartoli) in the state of jharkhand
 (total length 31.300 km) on hybrid annuity
 mode.
Read moreConstruction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreof your Industry type