Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Silt Clreance And Removal Of Blown Sand Of Punsisar Minor From Km 0.00 To Tail, Punras Minor From 0 To Tail,Bhurawas Minor From Km 0 To Tail,And Bhamra Minor From Km 0 To Tail
|
| Description |
Silt Clreance And Removal Of Blown Sand Of Punsisar Minor From Km 0.00 To Tail, Punras Minor From 0 To Tail,Bhurawas Minor From Km 0 To Tail,And Bhamra Minor From Km 0 To Tail
|
| Organisation | IGNP | State Govt. and UT |
| Tender Id | 2025_RIICO_483429_1 |
|
Reference Number |
NIT 04/2025-26/3 |
| Tender Fee | 1500 |
| EMD | 5720 |
| Tender Value | - |
| Place | Silt clreance and removal of blown sand of punsisa |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=891777 |
| Start Date | September 11, 2025 22:30 |
| End Date |
Expired
22/09/2025
Expired 362 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing bt road from pwd road to ponnagutta thanda (1/0 to 2/0 km) of shankarpally (m) in rangareddy district
Providing bt road from pwd road to ponnagutta thanda (1/0 to 2/0 km) of shankarpally (m) in rangareddy district
Read moreConstruction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) n
Construction of bridge / hlb on i) allapur to arutla x-road (via) thumbai thanda, kadilabavi thanda at km 1/6-8, km 3/8-10, km 6/4-6, ii) gudi malkapur to chelmada (via) kothulapuram, survail, lingamvari gudem, saigoni bavi at km 3/4-6, km 4/0-2, km 4/4-6, km 5/6-8, km 7/8-10, km 9/0-2, km 9/2-4, km 10/8-10, km 11/2-4, km 12/2-4, iii) lachammagudem to anthampet at km 2/8-10, survail to palivela (via) mallareddy gudem at km 6/2-4, km 7/0-2, km 7/4-6, km 8/8-10 (2 nos), km 11/0-2, km 11/6-8, iv) nh-65 to narayanpur (via) koyalagudem, d.nagaram, peepalpahad, allapur, venkambai thanda at km 3/0-2, km 3/8-10, km 8/2-4, km 10/2-4, km 11/0-2, km 16/0-2 in yadadri-bhongir district.
Read moreImprovement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Improvement of cuttack-chandbali road (dlps to 4-lane) from 2/350 km to 34/200 km in the district of cuttack under state plan
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreProposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar
Proposal for shifting of 33 kv,11kv,lt lines and dtrs which are obstructing 4 lane road widening works from kothapally to husnabad location 11/0 to 21/0 on the request of the executive engineer r and b, district karimnagar, in operation section nustulapur of operation division, karimnagar rural, operation circle, karimnagar
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreSilt clearance and removal of blown sand of punras minor from km 0.00 to tail,bhamra minor from km 0.00 to tail,bhurawas minor from km 0.00 to tail,punsisar minor at km 0.00 to tail
Silt clearance and removal of blown sand of punras minor from km 0.00 to tail,bhamra minor from km 0.00 to tail,bhurawas minor from km 0.00 to tail,punsisar minor at km 0.00 to tail
Read moreSilt clearance and removal of blown sand of punras minor from km 0.00 to tail,bhamra minor from km 0.00 to tail,bhurawas minor from km 0.00 to tail,punsisar minor at km 0.00 to tail
Silt clearance and removal of blown sand of punras minor from km 0.00 to tail,bhamra minor from km 0.00 to tail,bhurawas minor from km 0.00 to tail,punsisar minor at km 0.00 to tail
Read moreof your Industry type